Return to search

Kapacitetsberäkningsmodell för materialhanteringsflödet på Ericsson i Kumla

Ericsson’s factory in Kumla, Modules Kumla, became a hub for radio modules and micro base stations, which enables mobile communication through radio base stations, in 2004. Because of this the factory focuses more on the logistics operations. This has led to a need to be able to plan the capacity for the materials handling system. This master thesis has therefore been performed at Modules Kumla to develop a capacity calculation model for the material handling flow during the autumn of 2005. The work has contained a mapping of the material handling flow regarding to which activities was performed and how much time they consumed. By using data from the enterprise information system and simple linear regression a capacity calculation model was developed to calculate the amount of staff needed given a specific production and delivery rate.

Identiferoai:union.ndltd.org:UPSALLA1/oai:DiVA.org:liu-5429
Date January 2006
CreatorsBroberg, Anders, Luthman, Markus
PublisherLinköpings universitet, Ekonomiska institutionen, Linköpings universitet, Ekonomiska institutionen, Ekonomiska institutionen
Source SetsDiVA Archive at Upsalla University
LanguageSwedish
Detected LanguageEnglish
TypeStudent thesis, info:eu-repo/semantics/bachelorThesis, text
Formatapplication/pdf
Rightsinfo:eu-repo/semantics/openAccess

Page generated in 0.0026 seconds