Return to search

Kraftkabelförläggning i mark : - en studie av produktionsmetoder

The assignment given to us by NCC was to compose a degree project based on ground excavations for power cables. The aim of the study was to examine suitable excavation methods depending on different possible terrain conditions. The amount of previously written material within this subject is nearly non- existent and therefore there is a genuine interest by the NCC to receive a compilation of different production methods. The greater part of this study is based upon interviews with several companies active within this area of expertise. The technique of placing the electricity grid beneath ground for safety is today getting more and more common. The aftermath of the hurricane “Gudrun” has forced several power companies to re-evaluate their electric supply network, which has lead to more placements of power cables underground. We have come to the conclusion that there are several factors that would affect the method of choice for cable excavations. Costumer demands, obstacles and the difference in ground conditions are vital factors behind the verdict for suitable production methods.

Identiferoai:union.ndltd.org:UPSALLA1/oai:DiVA.org:vxu-955
Date January 2006
CreatorsIvansson, Patrik, Werner, Christian, Bengtsson, Jonas
PublisherVäxjö universitet, Institutionen för teknik och design, Växjö universitet, Institutionen för teknik och design, Växjö universitet, Institutionen för teknik och design
Source SetsDiVA Archive at Upsalla University
LanguageSwedish
Detected LanguageEnglish
TypeStudent thesis, info:eu-repo/semantics/bachelorThesis, text
Formatapplication/pdf
Rightsinfo:eu-repo/semantics/openAccess

Page generated in 0.0029 seconds