Return to search

Reliability assessment of non-utility generation and demand-side management In composite power systems

The last two decades have brought about significant changes in the resource planning environment of electric power utilities throughout the world. The conventional generation technologies that have been the backbone of every electric utility i.e., coal, hydro, nuclear, oil and natural gas, are being re-examined to address environmental concerns and resource utilization. The research described in this thesis focuses on the adequacy and economic assessment of non-utility generation (NUG) and demand-side management (DSM) initiatives within a typical power system. The main objective was to examine and extend the ability of the contingency enumeration approach to evaluate the economic reliability benefits of incorporating NUG and DSM options separately or jointly in composite system adequacy assessment. Two test systems were employed in the evaluations. The studies undertaken in this thesis demonstrate the need for accurate load model representations which clearly reflect the mix of customer sectors at each bus.Chronological hourly load curves were developed for each load bus in the test systems recognizing the individual load profiles of the customers. The adequacy and economic implications of demand-side management initiatives in the test systems were examined at each load point in the composite generation and transmission configuration. This thesis illustrates the development of techniques by which system planners and operators can incorporate reliability cost/worth assessment power system applications. Focus is placed in the thesis on the utilization of reliability cost/worth concepts in integrated resource planning in the form of NUG additions and DSM initiatives. Methods for the joint implementation of NUG and DSM options in a composite power system are presented and examples from the studies conducted are used to illustrate the procedures. Studies are presented which illustrate the impacts of NUG additions and DSM initiatives on the test system planning reserve margins (PRM) and on the total societal cost of electrical energy. The total evaluated cost incorporates the explicit cost associated with customer failures but does not include the cost associated with DSM program implementation. The results of the studies conducted show that NUG facilities and DSM programs can have considerable reliability and economic impacts on electric power systems.

Identiferoai:union.ndltd.org:USASK/oai:usask.ca:etd-10212004-001126
Date01 January 1998
CreatorsAdzanu, Steve Kwaku
ContributorsBillinton, Roy
PublisherUniversity of Saskatchewan
Source SetsUniversity of Saskatchewan Library
LanguageEnglish
Detected LanguageEnglish
Typetext
Formatapplication/pdf
Sourcehttp://library.usask.ca/theses/available/etd-10212004-001126
Rightsunrestricted, I hereby certify that, if appropriate, I have obtained and attached hereto a written permission statement from the owner(s) of each third party copyrighted matter to be included in my thesis, dissertation, or project report, allowing distribution as specified below. I certify that the version I submitted is the same as that approved by my advisory committee. I hereby grant to University of Saskatchewan or its agents the non-exclusive license to archive and make accessible, under the conditions specified below, my thesis, dissertation, or project report in whole or in part in all forms of media, now or hereafter known. I retain all other ownership rights to the copyright of the thesis, dissertation or project report. I also retain the right to use in future works (such as articles or books) all or part of this thesis, dissertation, or project report.

Page generated in 0.0015 seconds