Return to search

Tilt-up construction and design evaluation and methodology

Tilt-up construction basically involves job-site prefabrication of concrete building members under controlled and relatively economical conditions. This master’s report presents tilt-up design procedures, along with construction procedures and planning at the job-site, erection, finishing and architectural treatments. It is intended to bring together the five steps of design, planning, construction, erection, and finishing which are crucial to a successful tilt-up project. / text

Identiferoai:union.ndltd.org:UTEXAS/oai:repositories.lib.utexas.edu:2152/ETD-UT-2012-05-5098
Date06 August 2012
CreatorsSchuldes, Jesus Alberto
Source SetsUniversity of Texas
LanguageEnglish
Detected LanguageEnglish
Typethesis
Formatapplication/pdf

Page generated in 0.0018 seconds