Return to search

Market-based transmission congestion management using extended optimal power flow techniques

This thesis describes research into the problem of transmission congestion management. The causes, remedies, pricing methods, and other issues of transmission congestion are briefly reviewed. This research is to develop market-based approaches to cope with transmission congestion in real-time, short-run and long-run efficiently, economically and fairly. Extended OPF techniques have been playing key roles in many aspects of electricity markets. The Primal-Dual Interior Point Linear Programming and Quadratic Programming are applied to solve various optimization problems of congestion management proposed in the thesis. A coordinated real-time optimal dispatch method for unbundled electricity markets is proposed for system balancing and congestion management. With this method, almost all the possible resources in different electricity markets, including operating reserves and bilateral transactions, can be used to eliminate the real-time congestion according to their bids into the balancing market. Spot pricing theory is applied to real-time congestion pricing. Under the same framework, a Lagrangian Relaxation based region decomposition OPF algorithm is presented to deal with the problems of real-time active power congestion management across multiple regions. The inter/intra-regional congestion can be relieved without exchanging any information between regional ISOs but the Lagrangian Multipliers. In day-ahead spot market, a new optimal dispatch method is proposed for congestion and price risk management, particularly for bilateral transaction curtailment. Individual revenue adequacy constraints, which include payments from financial instruments, are involved in the original dispatch problem. An iterative procedure is applied to solve this special optimization problem with both primal and dual variables involved in its constraints. An optimal Financial Transmission Rights (FTR) auction model is presented as an approach to the long-term congestion management. Two types of series F ACTS devices are incorporated into this auction problem using the Power Injection Model to maximize the auction revenue. Some new treatment has been done on TCSC's operating limits to keep the auction problem linear.

Identiferoai:union.ndltd.org:bl.uk/oai:ethos.bl.uk:367856
Date January 2001
CreatorsWang, Xing
ContributorsSong, Y. H. ; Irving, M. R.
PublisherBrunel University
Source SetsEthos UK
Detected LanguageEnglish
TypeElectronic Thesis or Dissertation
Sourcehttp://bura.brunel.ac.uk/handle/2438/4804

Page generated in 0.0023 seconds