Return to search

Optimal production rates in opencast coal mining : a value driven approach

From small exploration companies to multi-national mining houses all at some point in the project lifetime embark on evaluation studies where the most value-generating method of extracting the ore is investigated. Early phases in exploration projects will have the need for an order-of-magnitude estimation as to the scale of the potential operation, and advanced projects will have detailed mine and financial plans to guide them to execution. In both instances this thesis provides a method of optimising the mining rate to deliver the highest possible value to the mining company whilst considering the possible risks from changes in the market. This can be compared to the value the country gains from the exploitation of its natural resources to find a mutually beneficial solution. Copyright / Dissertation (MSc)--University of Pretoria, 2012. / Geology / unrestricted

Identiferoai:union.ndltd.org:netd.ac.za/oai:union.ndltd.org:up/oai:repository.up.ac.za:2263/25878
Date26 June 2012
CreatorsDe Jongh, Iwan
ContributorsProf P Eriksson, Mr C C Callagham, iwan.dejongh@gmail.com
Source SetsSouth African National ETD Portal
Detected LanguageEnglish
TypeDissertation
Rights© 2011, University of Pretoria. All rights reserved. The copyright in this work vests in the University of Pretoria. No part of this work may be reproduced or transmitted in any form or by any means, without the prior written permission of the University of Pretoria

Page generated in 0.0082 seconds