Return to search

Shipbuilding integration

The build cycle of a first in class combat ship takes about six years. During that timeframe, systems are being designed, installed, and tested, but, until the ship is in the water and tested at sea trials, it is not known if the ship is fully integrated and will actually work. As time progresses, integration problems become harder and more expensive to solve. Every time a new system is added or upgraded, there may be interference from another system that was not anticipated. It is important to test and verify each system, but there is limited time and resources to do so. By successfully planning and performing systems integration at the correct time of the acquisition cycle, it is possible to reduce the chance of system failure. This thesis explains and establishes a process for designing and building a fully integrated combat ship by first defining systems integration for the customer and the shipbuilder and explaining why performing systems integration is important.

Identiferoai:union.ndltd.org:nps.edu/oai:calhoun.nps.edu:10945/1841
Date12 1900
CreatorsCarter, Joanna M.
ContributorsMarvel, Orin, Gudas, John, Naval Postgraduate School (U.S.).
PublisherMonterey California. Naval Postgraduate School
Source SetsNaval Postgraduate School
Detected LanguageEnglish
TypeThesis
Formatxiv, 53 p. : col. ill. ;, application/pdf
RightsApproved for public release, distribution unlimited

Page generated in 0.0019 seconds