Return to search

Procesorová výroba v rámci logistickeho řetězce firmy / Processing production in firm logistic

The paper describes how logistic influence process in the firm, also there is a comparation with other firms in automobile section. And second part describes a case study of job scheduling in a mechanical-engineering production, the goal is to minimise the overall processing time. The production jobs are processed by machines. This problem is treated as a hybrid five-stage flow-shop. In other words, the job-processing job consists of maximum five tasks, it depends on product, because there is 12 products, each has own production flow. It is a new type of flow-shop in which the first-stage scheduling depends upon the time scheduling of the second stage, and so on. A mathematical model and a heuristic method is formulated, The problem is the NP hardness. The case study is solved with the heuristic method and the solution achieved represents a 10% reduction of the processing time for the given set of jobs.

Identiferoai:union.ndltd.org:nusl.cz/oai:invenio.nusl.cz:10532
Date January 2008
CreatorsAltmanová, Lenka
ContributorsFábry, Jan, Zouhar, Jan
PublisherVysoká škola ekonomická v Praze
Source SetsCzech ETDs
LanguageCzech
Detected LanguageEnglish
Typeinfo:eu-repo/semantics/masterThesis
Rightsinfo:eu-repo/semantics/restrictedAccess

Page generated in 0.0033 seconds