Return to search

Lávka přes kolejiště / The footbridge across the track

This thesis describes the design of steel structures footbridge over the track in Havířov. The total length of the bridge is 101.6 m footbridge consists of four parts. The basic structural system of the first part of the beam is solidified arc. Other parts are made girders. Free bridge width is 3.2 m Footbridge will be used to connect local area Havířov - Šumbark to the train station.

Identiferoai:union.ndltd.org:nusl.cz/oai:invenio.nusl.cz:226079
Date January 2013
CreatorsMojžíš, Jan
ContributorsSýkora, Karel, Puchner, Josef
PublisherVysoké učení technické v Brně. Fakulta stavební
Source SetsCzech ETDs
LanguageCzech
Detected LanguageEnglish
Typeinfo:eu-repo/semantics/masterThesis
Rightsinfo:eu-repo/semantics/restrictedAccess

Page generated in 0.0018 seconds