Return to search

Porovnání produktivity prefabrikace a montáže potrubních dílů spojovaných obloukovým svařováním / The comparison of productivity of prefabrication and erection of pipe spools conected by arc welding

This thesis of a Master´s distant study program of M-STM Machinery technolofy and industrial design specialization proposes more efficient and quicker way of assembeling pipe technology systems using prefabrication of so called SPOOL "figure" in advance. The thesis proposes and from the technical-economical point of view assesses ways of manufacturing and proceeding the workshop weldings on pipe systems. While construction and design the programes of Areva and Autodesk companies were used.

Identiferoai:union.ndltd.org:nusl.cz/oai:invenio.nusl.cz:231001
Date January 2013
CreatorsHráček, Jan
ContributorsBednář, Karel, Kubíček, Jaroslav
PublisherVysoké učení technické v Brně. Fakulta strojního inženýrství
Source SetsCzech ETDs
LanguageCzech
Detected LanguageEnglish
Typeinfo:eu-repo/semantics/masterThesis
Rightsinfo:eu-repo/semantics/restrictedAccess

Page generated in 0.0729 seconds