Return to search

Bypassový systém parních turbín / Bypass steam turbine system

The master’s thesis deals with the bypass system of steam turbine, especially about its heating during normal operation and cold start up. At the beginning of work, a preliminary thermodynamic calculation of condensing steam turbine with two uncontrolled extractions is made. This is followed by theoretical description and design of bypass system and design of heating during normal operation and cold start-up. The main goal of thesis is optimalization of heating, when the heating branch is connected back to turbine supply line. In the end, all options of heating are compared in terms of power output.

Identiferoai:union.ndltd.org:nusl.cz/oai:invenio.nusl.cz:443169
Date January 2021
CreatorsMolák, Filip
ContributorsKracík, Petr, Fiedler, Jan
PublisherVysoké učení technické v Brně. Fakulta strojního inženýrství
Source SetsCzech ETDs
LanguageCzech
Detected LanguageEnglish
Typeinfo:eu-repo/semantics/masterThesis
Rightsinfo:eu-repo/semantics/restrictedAccess

Page generated in 0.0017 seconds