Return to search

Multidisciplinary Design Under Uncertainty Framework of a Spacecraft and Trajectory for an Interplanetary Mission

<p dir="ltr">Design under uncertainty (DUU) for spacecraft is crucial in ensuring mission success, especially given the criticality of their failure. To obtain a more realistic understanding of space systems, it is beneficial to holistically couple the modeling of the spacecraft and its trajectory as a multidisciplinary analysis (MDA). In this work, a MDA model is developed for an Earth-Mars mission by employing the general mission analysis tool (GMAT) to model the mission trajectory and rocket propulsion analysis (RPA) to design the engines. By utilizing this direct MDA model, the deterministic optimization (DO) of the system is performed first and yields a design that completed the mission in 307 days while requiring 475 kg of fuel. The direct MDA model is also integrated into a Monte Carlo simulation (MCS) to investigate the uncertainty quantification (UQ) of the spacecraft and trajectory system. When considering the combined uncertainty in the launch date for a 20-day window and the specific impulses, the time of flight ranges from 275 to 330 days and the total fuel consumption ranges from 475 to 950 kg. The spacecraft velocity exhibits deviations ranging from 2 to 4 km/s at any given instance in the Earth inertial frame. The amount of fuel consumed during the TCM ranges from 1 to 250 kg, while during the MOI, the amount of fuel consumed ranges from 350 to 810 kg. The usage of the direct MDA model for optimization and uncertainty quantification of the system can be computationally prohibitive for DUU. To address this challenge, the effectiveness of utilizing surrogate-based approaches for performing UQ is demonstrated, resulting in significantly lower computational costs. Gaussian processes (GP) models trained on data from the MDA model were implemented into the UQ framework and their results were compared to those of the direct MDA method. When considering the combined uncertainty from both sources, the surrogate-based method had a mean error of 1.67% and required only 29% of the computational time. When compared to the direct MDA, the time of flight range matched well. While the TCM and MOI fuel consumption ranges were smaller by 5 kg. These GP models were integrated into the DUU framework to perform reliability-based design optimization (RBDO) feasibly for the spacecraft and trajectory system. For the combined uncertainty, the DO design yielded a poor reliability of 54%, underscoring the necessity for performing RBDO. The DUU framework obtained a design with a significantly improved reliability of 99%, which required an additional 39.19 kg of fuel and also resulted in a reduced time of flight by 0.55 days.</p>

  1. 10.25394/pgs.25686489.v1
Identiferoai:union.ndltd.org:purdue.edu/oai:figshare.com:article/25686489
Date28 April 2024
CreatorsSiddhesh Ajay Naidu (18437880)
Source SetsPurdue University
Detected LanguageEnglish
TypeText, Thesis
RightsCC BY 4.0
Relationhttps://figshare.com/articles/thesis/Multidisciplinary_Design_Under_Uncertainty_Framework_of_a_Spacecraft_and_Trajectory_for_an_Interplanetary_Mission/25686489

Page generated in 0.0025 seconds