Return to search

Integrating Crew Scheduling and Rostering Problems

Crew scheduling and crew rostering are similar and related problems which can be solved by similar procedures. So far, the existing solution methods usually create a model for each one of these problems (scheduling and rostering), and when they are solved together in some cases an interaction
between models is considered in order to obtain a better solution.
A single set covering model to solve simultaneously both problems is presented here, where the total quantity of drivers needed is directly considered and optimized. This integration allows to optimize all of the depots at the same time, while traditional approaches needed to work depot by depot, and also it allows to see and manage the relationship between scheduling and rostering, which was known in some degree but usually not easy to quantify
as this model permits.
Recent research in the area of crew scheduling and rostering has stated that one of the current challenges to be achieved is to determine a schedule where crew fatigue, which depends mainly on the quality of the rosters created, is reduced. In this approach rosters are constructed in such way that stable working hours are used in every week of work, and a change to a different shift is done only using free days in between to make easier the adaptation to the new working hours.
Computational results for real-world-based instances are presented. Instances are geographically diverse to test the performance of the procedures and the model in different scenarios.

Identiferoai:union.ndltd.org:unibo.it/oai:amsdottorato.cib.unibo.it:2705
Date30 March 2010
CreatorsVera Valdes, Victor Andres <1975>
ContributorsToth, Paolo
PublisherAlma Mater Studiorum - Università di Bologna
Source SetsUniversità di Bologna
LanguageEnglish
Detected LanguageEnglish
TypeDoctoral Thesis, PeerReviewed
Formatapplication/pdf
Rightsinfo:eu-repo/semantics/openAccess

Page generated in 0.0013 seconds