Global ETD Search
Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.
Results
Showing 1 to 3 of 3 for “"4D Scheduling"”.
-
Investigating the Perceived Human Errors in 4D-BIM Construction Scheduling
Four-dimensional building information modeling (4D-BIM or 4D Scheduling) is well known to benefit the construction industry in many ways. 4D-BIM is an effective scheduling technique which integrates traditional scheduling methods and advanced visualization of the construction sequences in a 3D …
-
Developing a Hands-On Class Exercise for Modular Construction, 3D Design, and 4D Schedule
… understand the benefits of using 3D design with 4D scheduling over the use of 2D drawings.
-
Examining the Effectiveness of a 4D Schedule and a Virtual Reality Model on a Modular Project: UNLV Solar Decathlon Case
The use of a 4D schedule as technological advancement has brought significant improvement to the planning and execution of construction projects, through visualizing stepwise construction progress, following a sequence of pre-planned activities, and finalizing a baseline schedule with necessary …