Global ETD Search
Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.
Results
Showing 1 to 7 of 7 for “"ABC Connections"”.
-
Shake Table Studies of a Steel Girder Bridge System with ABC Connections
Accelerated bridge construction (ABC) reduces the onsite construction time by utilizing prefabricated elements. Connections between prefabricated elements are critical in high seismic areas to maintain the integrity of the bridge system. Various ABC connections have been investigated at the …
-
Experimental and Analytical Seismic Studies of a Two-Span Bridge System with Precast Concrete Elements and ABC Connections
Accelerated bridge construction (ABC) has gained acceptance as an alternative to conventional cast-in-place (CIP) construction. However, the lack of sufficient evidence that bridges incorporating precast elements and different ABC connections perform well under seismic loads has hindered and …
-
Experimental and Analytical Studies of a Two-Span Bridge System with Precast Elements Incorporating Rebar Hinge and Socket Connections
Accelerated bridge construction (ABC) has become an increasingly appealing alternative to conventional cast-in-place construction (CIP) because of the benefits it offers in reducing onsite construction time and traffic impact. Maintaining joint integrity between precast components during seismic …
-
Experiments, Analysis, and Design of Accelerated Bridge Construction (ABC) Units Continuous for Live Load
… utilized within accelerated bridge construction (ABC). However, the steel girder connections of SDCL bridges using ABC, along with associated design and experimental challenges have not been fully investigated. To further improve the long-term durability and performance of the structure, …
-
Precast Column-Footing Connections for Accelerated Bridge Construction in Seismic Zones
Accelerated bridge construction (ABC) has become increasingly popular in the eyes of state and federal transportation agencies because of its numerous advantages. To effectively execute ABC projects, designers utilize prefabricated structural elements that can be quickly assembled to form …
-
Towards Development and Implementation of eco2-UHPC: Material Characterization and Applications to Structural Precast Columns
… four eco 2 -UHPC bridge columns with different ABC connections under combined axial and quasi-static lateral cyclic loading; and finally, (4) perform shake table tests to investigate the dynamic behavior of eco 2 -UHPC bridge columns with ABC grouted duct connections. The doctoral study is …
-
Next Generation of Bridge Columns for Accelerated Bridge Construction in High Seismic Zones
Accelerated bridge construction (ABC) utilizes advanced planning, new construction techniques, and innovative detailing to facilitate construction. ABC offers many advantages over conventional construction, the most important of which is the reduction of onsite construction time. Even though ABC …