Global ETD Search
Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.
Results
Showing 1 to 14 of 14 for “"ARDOT"”.
-
Numerically Modeling Steel Continuous Bridges for Early Age Concrete Deck Cracking
… The Arkansas Department of Transportation (ARDOT) has experienced early age bridge deck cracking. ARDOT currently specifies a sequence deck pour on most of their bridges; however, contractors prefer continuous deck pours because of ease and construction time. During the period of this …
-
Comparing In-situ Liquefaction Triggering Procedures for Sites in Arkansas
… foundations in liquefiable soil. Currently ARDOT engineers use a Standard Penetration Test (SPT) based liquefaction spreadsheet developed 10 years ago to evaluate liquefaction triggering. Since this spreadsheet was developed, updates to the liquefaction triggering procedures have been …
-
Effect of Cement Content on Concrete Performance
… The Arkansas Department of Transportation (ARDOT) recognizes two types of concrete for use in bridge construction, Class S and Class S(AE). This paper focuses on the findings from testing of Class S(AE) concrete, short for Class S air entrained, as it is the primary concrete used in the …
-
Auto-Calibration of WIM Using Traffic Stream Characteristics
… by the Arkansas Department of Transportation (ARDOT). Typical auto-calibration algorithms compare the WIM measured weights of vehicles from the traffic stream to reference values, using five-axle tractor-trailer configured trucks for comparisons, e.g. Federal Highway Administration (FHWA) Class …
-
The Development of Initial Asphalt Mixture Acceptance Criteria Using the SCB test and the I-FIT Test
… from Arkansas Department of Transportation (ARDOT) projects that had been paved and distress surveys completed on. The mixtures fell into three categories, Poor, Fair, and Good cracking performance. After testing in the lab, the Flexibility Index (FI) values statistically grouped into three …
-
Examining the Effects of Reducing the Cement Content of Portland Cement Concrete Pavement
… the Arkansas Department of Transportation (ARDOT) specifies a minimum cementitious material content of 564 lb/yd3 and a maximum water-cementitious material ratio of 0.45. Prior research conducted at the University of Arkansas, TRC 0603, indicated concrete mixtures used in five bridge decks …
-
Review and Experimental Demonstration of the Concrete Maturity Method for Early Opening of Arkansas Pavements
… This project involves providing Arkansas DOT (ARDOT) with a procedure and tools for implementing the maturity approach, especially for early opening decisions, in their specifications, which are currently being rewritten.
-
Providing a Statistical Analysis Framework for Agencies to Analyze the Parameters Influencing the Rutting and Cracking Performance of Asphalt Mixtures
… data from two years of mix designs collected by ARDOT. To understand which asphalt mixture properties impact cracking and rutting in the field, Pearson correlation (PCM), Spearman rank correlation (SCM) and Kendall’s Tau (KCM) analysis methods were used. After running these analysis methods, …
-
Evaluating Arkansas Weathering Steel Bridge Performance
… for Arkansas Department of Transportation (ARDOT) bridge inspectors to identify and grade oxide film degradation.
-
An Investigation into the Effect of Performance Engineered Mixture (PEM) Design on the Workability and Strength of Concrete Pavement Mixtures
The Arkansas Department of Transportation (ARDOT) currently requires a minimum cement content of 564 pounds of cement per cubic yard of concrete. This minimum cement requirement can be reduced through the utilization of optimized gradation of aggregates within concrete mixtures as well as the …
-
Improve the Prediction of Camber, Deflection, and Prestress Losses in Precast, Prestressed Concrete Bridge Girders
… testing showed that the current method that the ARDOT uses overestimates camber, specifically in the AASHTO Type II and III girders. Field measurements indicated that the design erection camber was greater than the average measured camber by 67%, 128%, 61%, and 25% for the AASHTO Type II, III, …
-
Study of Internal Strains Developed in Concrete Decks at Early Ages in Steel Continuous Bridges
The Arkansas Department of Transportation (ARDOT) has identified bridge deck cracking shortly after concrete decks are placed and prior to applying traffic loads. Previous researchers have confirmed improper construction practices and design methods can lead to deck cracking. Currently, many …
-
Cement Stabilized Crushed Stone Base Course Strength and Stiffness Analysis
… strength of CSCSBC for use in Arkansas DOT (ARDOT) projects. This research is not focused on the benefits or disadvantages of 1993 AASHTO to MEPDG, and instead will only be focused on the inputs of both. A range of tests were performed to characterize the strength and stiffness of a test …
-
Applying UAS LiDAR for Developing Small Project Terrain Models
… UAS LiDAR was assessed by comparing the UARK and ARDOT LiDAR datasets and ground survey data collected using GNSS and total station checkpoints for hard and soft surfaces. Errors between the UAS LiDAR and checkpoints were compared using aerial photos, bar graphs, and box and whisker plots, and …