Global ETD Search
Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.
Results
Showing 1 to 20 of 56 for “"Accelerated Bridge Construction (ABC)"”.
-
Full-Scale Testing of Accelerated Bridge Construction (ABC) Units for Texas Bridges
New construction on bridges across the country is typically done in place, with long construction times leading to traffic delays, cost overruns, and safety issues. Prefabricated Accelerated Bridge Construction (ABC) units alleviate most of these issues. Construction techniques utilizing ABC units …
-
Experiments, Analysis, and Design of Accelerated Bridge Construction (ABC) Units Continuous for Live Load
… dead load and continuous for live load (SDCL) bridge systems have been developed over the past twenty years and are popular in many regions of the U.S. While SDCL has gained popularity for conventional steel bridge systems, they are starting to be utilized within accelerated bridge construction …
-
Seismic performance of accelerated bridge construction (ABC) precast bulb-tee girder-to-bent cap connection
… structurally deficient or functionally obsolete bridges at more than 20% of the nation’s 607,380 bridges in 2013, the nation need to work effectively to decrease the total number below to 15% over the next decade. Accelerated Bridge Construction (ABC) techniques using the precast components are …
-
Finite Element Modeling of Transverse Post-Tensioned Joints in Accelerated Bridge Construction (ABC) Full-Scale Precast Bridge Deck Panels
Accelerated bridge construction (ABC) techniques are popular among the department of transportations (DOTs). Innovative design and construction methods and high performance materials are used to reduce the typical bridge construction timeline without sacrificing bridge quality. The goal of …
-
Evaluate the performance of closure joints for side-by-side accelerated bridge construction (ABC) superstructure systems by using field instrumentation methods
… today is devising a plan to fix deteriorating bridges while also accommodating vehicles on the roadway and keeping workers safe. One way to do this is through the use of accelerated bridge construction (ABC), which accomplishes the goal of minimizing traffic disruptions and construction time by …
-
Evaluate the performance of closure joints for side-by-side Accelerated Bridge Construction (ABC) superstructure systems by large-scale testing methods
… technology that is currently implemented in both bridge repair and new construction is Accelerated Bridge Construction (ABC). ABC aims to reduce construction time, traffic impacts, and overall project performance through the utilization of innovative design, materials, and methods. One such …
-
Development and optimization of ultra-high performance concrete using local materials
Accelerated Bridge Construction (ABC) is a set of design principles that allow for the rapid construction of bridges. In accelerated bridge construction, a material known as ultra-high performance concrete (UHPC) is often used to join structural elements of the bridge together. While the material …
-
Evaluation of accelerated bridge construction methods and designs in the state of Iowa
<p>Accelerated bridge construction (ABC) is the general term given to a variety of approaches aimed at reducing construction durations of bridge projects. Using these approaches on bridge projects introduces a number of advantages including reduced traffic disruption and increased safety. This …
-
Drilled Shaft Socket Connections for Precast Columns in Seismic Regions
… and a drilled shaft has been developed for Accelerated Bridge Construction (ABC) in regions of moderate or high seismicity. This connection can be built quickly and allows generous placement tolerances. Three quasi-static tests of connections between a precast bridge column and a drilled …
-
Design and Constructability of Wide-Flange UHPC Bridge
Construction of highway bridge girders using conventional prestressed concrete is a widely accepted norm in the state of Texas. But the limited life and the lengthy on-site construction work is a serious concern to the travelling public. This research looks into the design and constructability of …
-
The Effect of Alternative Delivery on Accelerated Bridge Construction Projects
<p>Accelerated Bridge Construction (ABC) is an option that state transportation agencies can use to repair or replace bridges in a shorter amount of time. This option offers a way to save on user costs and to increase the safety of the traveling public and the workers by reducing the amount of time …
-
Precast concrete bridge barriers for accelerated bridge construction
… transportation organizations have embraced Accelerated Bridge Construction (ABC) to reduce both the traffic impacts and societal costs. One of the most common means to achieve ABC is to utilize prefabricated elements, which are connected together on-site to construct a bridge. ABC will not …
-
Evaluating the Effects of Shored Construction on Steel Girder Composite Bridges
<p>Steel composite girder bridges provide economic advantages and higher load-carrying capacity than non-composite alternatives. Over the years, a conventional sequence of un-shored construction for steel girder composite bridges has been developed. There is an alternative construction sequence, …
-
Shake Table Studies of a Steel Girder Bridge System with ABC Connections
Accelerated bridge construction (ABC) reduces the onsite construction time by utilizing prefabricated elements. Connections between prefabricated elements are critical in high seismic areas to maintain the integrity of the bridge system. Various ABC connections have been investigated at the …
-
Connections boulonnées des éléments préfabriqués des piles de ponts
Dans le contexte de la construction accélérée des ponts (Accelerated Bridge Construction – ABC), la connexion entre les colonnes préfabriquées et leurs fondations constitue le point critique gouvernant la sécurité structurale de l’ouvrage, particulièrement durant les phases de construction. Ce …
-
Shifted Plastic Hinge Column Connections Using Grouted Sleeves for Accelerated Bridge Construction
Accelerated bridge construction (ABC) is being increasingly used in new bridge construction and repair. ABC typically requires prefabricated elements joined with mechanical couplers. Grouted sleeves (GSs) offer good construction tolerances and load transfer between precast elements. However, …
-
Field Performance Assessment of Press-Brake-Formed Steel Tub Girder Superstructures
The Short Span Steel Bridge Alliance (SSSBA) is a group of bridge and culvert industry leaders (including steel manufacturers, fabricators, service centers, coaters, researchers, and representatives of related associations and government organizations) who have joined together to provide …
-
Guideline for Implementing Accelerated Bridge Construction in South Dakota
… conducted to investigate the implementation of accelerated bridge construction (ABC) in South Dakota. Accelerated bridge construction is defined as construction practices that employ innovative techniques to reduce on-site construction time and interruption to traffic. Less interruption to …
-
Ultra-High Performance Concrete for Precast Seismic Bridge Column Connection
Accelerated bridge construction (ABC) utilizes prefabricated bridge elements constructed off-site, delivered, and assembled on-site to expedite construction time and reduce traffic disruption. ABC has been increasingly used for super- and sub-structure elements in low seismic regions. However, its …
-
Application of Ultra-High Performance Concrete in Prefabricated Bridge Element Connections for Accelerated Bridge Construction
A relatively new type of beam falling under the accelerated bridge construction (ABC) umbrella, the Northeast Extreme Tee (NEXT) D beam, was designed by the PCI Northeast Bridge Technical Committee, with connection details that substitute traditional welded ties joining butted-beam systems, such as …
Page 1 of 3