Numerical study of the semi-ellipsoidal TBM cutterhead on ground behavior and effects of the new design
… stress distribution, thrust, torque and advance rate on both models i.e., semi-ellipsoidal cutterhead and conventional cutterhead in Earth Pressure Balance and Slurry TBMs. Results indicate that the semi-ellipsoidal design provides a more uniform distribution of stresses and …
-
Examination of excavation chamber pressure behavior on a 17.5 m diameter earth pressure balance tunnel boring machine
… were influenced by changes in volumetric flow rates into the chamber via the cutterhead and out of the chamber via the screw conveyor. Increases/decreases in net volumetric inflow caused increases/decreases in chamber pressure. The magnitudes of pressure changes were linearly correlated to the …
-
Lean tools selection for mining : an occupational health and safety approach
… an important productivity indicator (i.e. daily advance rate) and OHS indicators (i.e. body reaction and struck by an object) in the Canadian underground gold mining. Based on the results of this thesis, a lean mining lifecycle framework with four different phases and a set of lean tools (i.e. …
-
Improved tunneling knowledge through robust machine learning
… that are correlated with changes in the EPBM's advance rate. We found that current ensemble feature selection methods are insufficient for our data sets; thus, we created a novel ensemble feature selection method, JENNA Ensemble Network Normalization Algorithm (JENNA). JENNA allows diversity in …
-
The North Helvetic Flysch of eastern Switzerland
… by very thick bedded turbidite sands generated by thrust induced seismic events confined within the thrust-top basin. The Outer basin (240m min. thickness) comprises 10-15 sand packages (5-100m thick) formed by turbidite sands which are commonly amalgamated. Sedimentation in the Outer …
-
Strain Components in Friction Stir Extrusion
… parameters evaluated in this work are die advance rate, die rotational seed, and die geometry. A total of 16 wires were extruded using different combinations of these process parameters. Marker wires were inserted into the billets prior to extrusion to observe material flow throughout the …
-
Remote Sensing, Morphologic Analysis, and Analogue Modeling of Lava Channel Networks in Hawai`i
… behavior is not fully understood. In Hawai`i, advances in remote sensing are offering new insights into lava flow emplacement. In this dissertation, I develop new techniques using satellite-based synthetic aperature radar, aerial photographs, and airborne lidar to produce three-dimensional …
-
Time-dependent Analysis of Jet-grouted Tunnels in Difficult Ground Conditions
… are becoming more economical. Furthermore, advances in the construction technology have made it feasible to construct tunnels in difficult ground conditions. By providing a grouted arch ahead of the tunnel face, jet-grouting has proved effective for the stability and performance of tunnels …
-
Examining the possibility of estimating activity time distributions from recorded downtimes in TBM tunnelling operations using discrete event simulation (DES) models
… by tunneling industry, the calculation of TBM advance rates has always been a challenge in setting project budgets and schedules. TBM advance rate is a function of penetration rate and machine utilization, which is simply the ratio of boring time to total project time. Utilization is an …
-
Detecting changing geologic conditions with tunnel boring machines by using passive vibration measurements
… structure were considered. Additionally, an advanced filtering method was tested to more completely explore the complicated relationship between vibration and geology. Results from this study yield a number of interesting findings. First, that the passive vibration measurements can be used to …
-
Analysis of TBM tunnelling performance in faulted and highly fractured rocks
… and faulted rocks. Despite the great production rates recorded in favourable ground conditions, the TBM advance can be significantly slowed down in limiting geological situations such as extremely fractured and fault zones. After an introduction about the major issues resulting from tunnelling in …
-
Comparison of two different tunnelling methods in hard rock - With a focus on the geological parameters
… tunnels. For example, the estimated average advance rate for the water tunnel using the TBM method is about 65m/week and about 39m/week with the D&B method. Investigating other factors that influenced the tunnelling method, such as equipment parameters and construction processes, recommended …
-
Understanding emplacement of rapidly-emplaced volume-limited lava flows from Mount Etna’s 2011-2012 eruption : a multidisciplinary study
… flow, number of confluences, average and maximum advance rate in the proximal zone, and duration of fire fountaining. However, unlike previous studies, no correlation was found between final flow length and mean output rate. Visual analysis identified two flow groups based on morphology within the …
-
Estimation of the utilization rate for pressurized face shielded TBMs using discrete event simulation
… working time is called the machine utilization rate and represents the efficiency of operations, operational, and management factors. Calculation of the TBM utilization rate involves dividing the duration of the boring time by the total duration of all construction activities, which includes all …
-
Development and application of a modified rock mass rating system for fault zones
… fault zones, and existing correlations to the advance rates of excavation methods of drill and blast and various TBM types, the double shield TBM was selected as the excavation method that will provide the highest overall advance rate and expected stability for a new bore of the EJMT.
-
Learning from slurry circuit and excavation chamber pressure data from a 14-m diameter variable density TBM
… pressure gradient is not consistently an accurate measure of density in the excavation chamber. The development of effective stresses in the excavation chamber material is discussed as a reason for poor estimation of the excavation chamber density by the vertical pressure gradient. Pore water …
-
Experimental Investigation on the Use of Water Soluble Polyacrylamides as Thickeners During CO_(2) WAG EOR
… polymers used for EOR applications in CO_(2) saturated environments becomes necessary. Also, the possibility to extrapolate the benefits observed in heavy oil to light and medium oil reservoirs needs to be assessed as they gather the majority of the existing CO_(2) applications. This thesis …
-
Remote Detection of Surging Glaciers Across High Mountain Asia
… Surging variables, including duration, terminus advance distance, terminus advance rate, and surge recurrence intervals were also quantified using terminus change profiles. A statistical assessment was performed on the data to test surging relationships both intra- and extra- sub-regionally. In …
-
Examination of Geological Influence on Machine Excavation of Highly Stressed Tunnels in Massive Hard Rock
… and to combine these factors within a TBM advance framework. This was achieved by incorporating aspects of geology, tectonics, mineralogy, material strength theory, fracture process theory and induced stresses. Three main approaches were used to verify and calibrate the Geomechanical …