Global ETD Search
Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.
Results 1 to 8 of 8 for “"Advanced Work Packaging (AWP)"”
-
A Framework to Assess the Costs and Benefits of Utilizing Advanced Work Packaging (AWP) in Industrial Construction
… by the construction industry institute (CII) is advanced work packaging (AWP). The term advanced work packaging refers to a disciplined process for project planning and execution; it was developed to address challenges such as cost and schedule overruns in the industrial construction sector. AWP …
-
Advanced Work Packaging from project definition through site execution : driving successful implementation of WorkFace Planning
Capital projects use work packaging to divide their projects' scope into manageable portions of work for planning and execution, all to achieve improved productivity and increased predictability. However, currently, no common industry standard for work packaging is widely and uniformly implemented …
-
Identification of strategies to overcome barriers for the implementation of advanced work packaging
Work packaging is not a new concept for the construction industry. One work packaging method is Advanced Work Packaging (AWP), a construction-driven process that adopts the philosophy of “beginning with the end in mind”. Even though AWP was established as a CII Best Practice in 2015 and case …
-
Modelo para gestão das restrições no sistema Last Planner com apoio do Advanced Work Packaging
… a explorar o uso do método de planejamento Advanced Work Packaging (AWP), visando tirar proveito de suas características, aliando-as ao SLP no sentido de trazer melhorias na análise e gerenciamento das restrições em empreendimentos da construção. Oriundo de obras industriais e …
-
L'ontologie du Lean Construction 4.0 dans l'industrie de la construction
… compare la Construction Lean avec la méthode Advanced Work Packaging (AWP), deux méthodes de gestion de projets de construction. Leur intégration peut promouvoir collaboration, efficacité et amélioration continue, bien que des études supplémentaires soient nécessaires pour confirmer ces …
-
Assessing advanced work packaging in industrial construction - quantitative evidence and qualitative investigation of implementation
… of construction field time is spent on direct work, the portion of a craft worker’s time that physically advances the project scope. Advanced Work Packaging (AWP) is a construction- driven methodology, designated a best practice by the Construction Industry Institute (CII) in 2015, that aligns …
-
A Data-Driven Decision Support System to Enhance Planning and Scheduling in Industrial Construction Projects
… complexity of managing extensive resources and a workforce. These projects often suffer from delays and cost overruns exacerbated by the lack of integration and automation in current scheduling practices, as well as fragmented data storage and retrieval systems. Traditional approaches to planning …
-
Perspectives ontologiques sur l'Advanced Work Packaging (AWP) dans le management de projet de construction : Les contributions des innovations en blockchain et construction
… examine l'intégration des méthodologies de l'Advanced WorkPackaging (AWP), de la Construction Lean (LC) et de la Réalisation de Projet Intégrée (RPI)au sein du secteur de la construction en France pour faire face aux défis de l'industrie tels queles inefficacités, les coûts élevés et les …