Global ETD Search
Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.
Results
Showing 1 to 5 of 5 for “"Automated progress tracking"”.
-
Activity-Based Data Fusion for the Automated Progress Tracking of Construction Projects
… recent years, many researchers have investigated automated progress tracking for construction projects. These efforts range from 2D photo-feature extraction to 3D laser scanners and radio frequency identification (RFID) tags. A multi-sensor data fusion model that utilizes multiple sources of …
-
Automated Construction Progress Tracking using 3D Sensing Technologies
Accurate and frequent construction progress tracking provides critical input data for project systems such as cost and schedule control as well as billing. Unfortunately, conventional progress tracking is labor intensive, sometimes subject to negotiation, and often driven by arcane rules. Attempts …
-
A Better Programming Teaching Tool - An Interactive Teaching Platform with Course Management, Real-Time Insights and AI-Generated Hints
… The platform features real-time task submission, automated progress tracking, and AI-generated subgoals and hints that are tailored to each student’s progress. Teachers can create and manage tasks, monitor student performance, and adapt content to meet students needs. Through the integration of a …
-
Pipe and Ductwork Progress Tracking using 3D Sensing Technologies
Automated construction progress tracking is becoming critical to efficient and effective construction management. More and more construction companies are putting aside the old way of tracking progress, which was mainly based on foremen daily reports and visual inspections, and are adopting 3D …
-
Interactive Voice-Visual Tracking of Construction As-Built Information
… to construction projects is essential for tracking progress, planning corrective action, and analyzing the schedule. The collection of site information, however, is currently a challenging, time-consuming, and error-prone manual process. To improve the tracking of as-built information, this …