Global ETD Search

Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.

Results

Showing 1 to 3 of 3 for “"Automatic data transfer"”.

  1. Integrating Building Information Modelling (BIM), Cost Estimating and Scheduling for Buildings Construction at the Conceptual Design Stage

    … (BIM), which is a technology that enhances data transfer and ensures cooperation among designers, engineers, and contractors, can provide an efficient way for cost estimating and schedule planning. On the other hand, sustainability has drawn more and more attention by the construction …

    ottawa-retro Repository record for Integrating Building Information Modelling (BIM), Cost Estimating and Scheduling for Buildings Construction at the Conceptual Design Stage (opens in a new tab)

  2. Automated Simulation Environment for Enhanced Radar Technology Learning Creating Scenarios using Deep Machine Learning and Stochastic Target Trajectories for Future Radar Simulation

    … semantic segmentation and a U-Net structure. The data from the network includes information about the terrain’s elevation and the corresponding surface color based on the terrain type. This data serves as the basis for creating a 3D environment using a Python 3D plotting library. Targets are …

    chalmers Repository record for Automated Simulation Environment for Enhanced Radar Technology Learning Creating Scenarios using Deep Machine Learning and Stochastic Target Trajectories for Future Radar Simulation (opens in a new tab)

  3. The difference in BIM component data requirements between prescriptive representations and actual practices

    … and Maintenance (OandM) phase by improving data management. However, there are technological, process related, and organizational barriers to successful implementation of BIM integrated FM (BIM-FM), and process related barriers might be solved by the use of BIM integrated FM (BIM-FM) …

    vt Repository record for The difference in BIM component data requirements between prescriptive representations and actual practices (opens in a new tab)