Global ETD Search

Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.

Results

Showing 1 to 20 of 49 for “"BC Hydro"”.

  1. Probabilistic transient stability studies using the BC Hydro system

    … to extract more value out of existing assets. BC Hydro's current deterministic practice is to study the "worst case", where all faults are assumed to be 3$ bus faults with unsuccessful reclosing, at a load factor of 100%. A review of historical fault data from BC Hydro's 500 kV system over the …

    ubc Repository record for Probabilistic transient stability studies using the BC Hydro system (opens in a new tab) Download PDF for Probabilistic transient stability studies using the BC Hydro system (opens in a new tab)

  2. Comprehensive review of plunge pool performance at four of BC Hydro dam sites and assessment of scour extent

    The plunge pool performance at four of BC Hydro dam sites is reviewed. The sites of Peace Canyon Dam, Seven Mile Dam, Portage Mountain Project, and Revelstoke Dam are described in terms spillway design, plunge pool geology, and historical spillway outflows. The main factors susceptible to affect …

    ubc Repository record for Comprehensive review of plunge pool performance at four of BC Hydro dam sites and assessment of scour extent (opens in a new tab) Download PDF for Comprehensive review of plunge pool performance at four of BC Hydro dam sites and assessment of scour extent (opens in a new tab)

  3. Maximizing energy savings reliability in BC Hydro industrial Demand-Side Management programs: an assessment of performance incentive models.

    … on measured energy savings over time. As BC Hydro increases its DSM initiatives to meet the Clean Energy Act objective to reduce at least 66 per cent of new electricity demand with DSM by 2020, the utility is faced with a higher level of DSM risk, or uncertainties that impact the …

    uvic Repository record for Maximizing energy savings reliability in BC Hydro industrial Demand-Side Management programs: an assessment of performance incentive models. (opens in a new tab)

  4. Random effects mixture models for clustering time series

    … time series of electricity load (demand) for BC Hydro customers. BC Hydro collects electricity load data for selected customers for the purpose of grouping customers into homogeneous classes in terms of the load. Such homogeneous classes or clusters are useful for rate setting and long term …

    uvic Repository record for Random effects mixture models for clustering time series (opens in a new tab)

  5. Value of pumped-storage hydro for wind power integration in the British Columbia hydroelectric system

    … of significant amounts of wind power as part of BC Hydro calls for clean renewable energy resources. The inherent variability and uncertainty of wind power will impact the operation of the BC Hydro system. If the system loses some of its flexibility in the process of integrating more wind power, …

    ubc Repository record for Value of pumped-storage hydro for wind power integration in the British Columbia hydroelectric system (opens in a new tab) Download PDF for Value of pumped-storage hydro for wind power integration in the British Columbia hydroelectric system (opens in a new tab)

  6. Generalized optimization in the British Columbia hydroelectric system

    … is to provide a decision analysis tool for BC Hydro medium-term planning engineers to enable them to derive optimal generation schedules to assess the feasibility, advantages and disadvantages of operational alternatives. The development of a six-component system facilitates the analysis of …

    ubc Repository record for Generalized optimization in the British Columbia hydroelectric system (opens in a new tab) Download PDF for Generalized optimization in the British Columbia hydroelectric system (opens in a new tab)

  7. Opening a policy window for organisational change: the creation of BC Hydro's Water Use Planning program

    … process aimed at revising the operating plans of BC Hydro’s hydroelectric facilities in order to consider water values beyond electricity generation. The purpose of this thesis is to analyse the particular circumstances that led to the emergence of WUP and prompted BC Hydro to open up its …

    ubc Repository record for Opening a policy window for organisational change: the creation of BC Hydro's Water Use Planning program (opens in a new tab) Download PDF for Opening a policy window for organisational change: the creation of BC Hydro's Water Use Planning program (opens in a new tab)

  8. Modeling forced outage in hydropower generating units for operations planning model

    … act as a source of operational uncertainty for hydropower companies like BC Hydro. Forced outages reduce plant availability and causes loss of system flexibility and revenues. A combination of both likelihood of occurrence (frequency) and severity of outage event (duration) truly represents the …

    ubc Repository record for Modeling forced outage in hydropower generating units for operations planning model (opens in a new tab) Download PDF for Modeling forced outage in hydropower generating units for operations planning model (opens in a new tab)

  9. Decision analysis framework for high inflow events for small hydropower reservoir systems

    Hydro system operators are often confronted with a myriad of conflicting and challenging decision situations. In particular, managing hydroelectric facilities during high inflow or unusual events can be complex, time consuming and challenging. Most high inflow events that challenge operational …

    ubc Repository record for Decision analysis framework for high inflow events for small hydropower reservoir systems (opens in a new tab) Download PDF for Decision analysis framework for high inflow events for small hydropower reservoir systems (opens in a new tab)

  10. Building information modeling for construction applications : formwork installation and quantity takeoff

    … drawings to support formwork construction on the BC Hydro Substation project, and (2) BIM for quantity takeoff to support life-cycle assessment (LCA) and construction cost estimating on the Pharmaceutical Sciences project. The BC Hydro project provided an opportunity to examine the use of BIM for …

    ubc Repository record for Building information modeling for construction applications : formwork installation and quantity takeoff (opens in a new tab) Download PDF for Building information modeling for construction applications : formwork installation and quantity takeoff (opens in a new tab)

  11. A goal programming algorithm to incorporate the Columbia river non-power flow requirements in the Columbia River treaty model

    … Columbia River Treaty Model (CRTM) developed by BC Hydro was modified by this research to incorporate three non-power requirements that are agreed upon by both Entities. The new model, which utilized the Goal Programming technique to solve the multi-objective reservoir optimization problem, was …

    ubc Repository record for A goal programming algorithm to incorporate the Columbia river non-power flow requirements in the Columbia River treaty model (opens in a new tab) Download PDF for A goal programming algorithm to incorporate the Columbia river non-power flow requirements in the Columbia River treaty model (opens in a new tab)

  12. Tsuwalhkálh Ti Tmícwa = (The land is ours): St’át’imc self-determination in the face of large-scale hydro-electric development

    … transforming relationship between St’át’imc, BC Hydro and the Province of BC. Interior Salish St’át’imc people are currently navigating through a significant phase of increasing jurisdiction and authority and recognition of (unsettled) territorial property relationships. This very dynamic …

    uvic Repository record for Tsuwalhkálh Ti Tmícwa = (The land is ours): St’át’imc self-determination in the face of large-scale hydro-electric development (opens in a new tab)

  13. Performance of a sampling stochastic dynamic programming algorithm with various inflow scenario generation methods

    … value, while meeting consumer demand for the BC Hydro hydroelectric system in British Columbia, Canada. The implementation includes power generation facilities on the Columbia and Peace River systems. Variability of natural streamflow into a reservoir is a major source of uncertainty when …

    ubc Repository record for Performance of a sampling stochastic dynamic programming algorithm with various inflow scenario generation methods (opens in a new tab) Download PDF for Performance of a sampling stochastic dynamic programming algorithm with various inflow scenario generation methods (opens in a new tab)

  14. The political economy of British Columbia’s fiscal transition under decarbonization: Public revenue, staples, and institutional path dependency

    … on a mixed-methods approach, the study examines BC Public Accounts documents spanning from 1990 to 2024 alongside relevant secondary sources that provide additional economic, political, and social context. The public accounts analysis primarily traces revenue from natural resources, the carbon …

    uvic Repository record for The political economy of British Columbia’s fiscal transition under decarbonization: Public revenue, staples, and institutional path dependency (opens in a new tab)

  15. Building the capacity for watershed governance

    BC Hydro’s Water Use Planning (WUP) process is one of the world’s most comprehensive hydroelectric dam operational reviews and has served as a model to revise hydropower operating plans with the participation of an inclusive range of stakeholders, rights holders, and the use of up-to-date …

    uvic Repository record for Building the capacity for watershed governance (opens in a new tab)

  16. Value of pumped storage systems in British Columbia

    … are well suited for the development of Pumped Hydro Storage (PHS). The goal of this thesis is to investigate the value of the integration of a PHS plant in the BC Hydro system at a high level of planning. BC Hydro’s Generalized Optimization Model, used for medium to long term planning, was …

    ubc Repository record for Value of pumped storage systems in British Columbia (opens in a new tab) Download PDF for Value of pumped storage systems in British Columbia (opens in a new tab)

  17. Development and evaluation of a multi-objective optimization model for multi-reservoir systems

    The BC Hydro and Power Authority is the largest electric utility in the province of British Columbia, Canada. With a generating capacity of more than 12,000 MW, it serves almost 2 million customers in the province. It operates 31 hydroelectric facilities, most of them located in multi-reservoir …

    ubc Repository record for Development and evaluation of a multi-objective optimization model for multi-reservoir systems (opens in a new tab) Download PDF for Development and evaluation of a multi-objective optimization model for multi-reservoir systems (opens in a new tab)

  18. Analysis of the management of uncertainty in long-term planning for electric utilities

    … house gas regulations, and water inflows for hydroelectric-dominated utilities, just to name a few. This study examines the current planning methods in use among (largely North American) utilities with a particular focus on the features of each method that manage or mitigate uncertainty. The …

    ubc Repository record for Analysis of the management of uncertainty in long-term planning for electric utilities (opens in a new tab) Download PDF for Analysis of the management of uncertainty in long-term planning for electric utilities (opens in a new tab)

  19. Canadian Aboriginal voice : retooling Hirschman’s concepts of voice and exit

    … Assessment currently underway between BC Hydro and the West Moberly First Nations. The case study applies ideas developed in Part I, highlighting barriers to Aboriginal participation. Throughout, this research examines the colonial relationship found within Canadian institutions and …

    ubc Repository record for Canadian Aboriginal voice : retooling Hirschman’s concepts of voice and exit (opens in a new tab) Download PDF for Canadian Aboriginal voice : retooling Hirschman’s concepts of voice and exit (opens in a new tab)

  20. Vis à vis : a working centre and small business hotel in Vancouver

    … is faced by a park - one is adjacent to the new BC Hydro Building, the other is Cathedral Square. This project incorporates landscape elements (a bed of trees, a trough of water, a central court, a swimming pool) within the organization of its two programmes. Several landscape elements are …

    ubc Repository record for Vis à vis : a working centre and small business hotel in Vancouver (opens in a new tab) Download PDF for Vis à vis : a working centre and small business hotel in Vancouver (opens in a new tab)

Page 1 of 3