Global ETD Search

Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.

Results

Showing 1 to 3 of 3 for “"Bipole III"”.

  1. Exploring the use of adaptive management in an environmental protection program to improve mitigation performance during manitoba hydro transmission projects

    … Protection Program during construction of the Bipole III transmission line and its use of AM. Researching the program’s functionality spanned three construction seasons using document review, employee interviews and site visits. The program was evaluated according to what current literature …

    manitoba Repository record for Exploring the use of adaptive management in an environmental protection program to improve mitigation performance during manitoba hydro transmission projects (opens in a new tab)

  2. A sustainable outlook in an era of uncertainty: A case study of Manitoba Hydro

    The historical record of Manitoba Hydro, Manitoba’s largest crown corporation, is a rich case study that contextualizes and affirms the numerous public policy challenges confronting Manitoba’s polity in the twenty-first century. Manitoba Hydro’s contemporary history is mired-in ongoing political …

    manitoba Repository record for A sustainable outlook in an era of uncertainty: A case study of Manitoba Hydro (opens in a new tab)

  3. Cumulative Effects on Human Health within the Hydroelectric Sector: A Case Study of Manitoba Hydro

    … projects –Wuskwatim Generating Station, Bipole III Transmission Project, and Keeyask Hydroelectric Generating Station – located in the Nelson River watershed in northern Manitoba. Results indicate that the consideration of human health issues in EA has gradually improved over time; …

    sask Repository record for Cumulative Effects on Human Health within the Hydroelectric Sector: A Case Study of Manitoba Hydro (opens in a new tab)