Global ETD Search
Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.
Results 1 to 1 of 1 for “"Block-Cave Production Scheduling"”
-
Block-Cave Extraction Level and Production Scheduling Optimization under Grade Uncertainty
… are favored because of their low-cost and high-production rates. They offer a much smaller environmental footprint compared to equivalent open-pit operations due to the much smaller volume of waste to be moved and handled. Planning of caving operations poses complexities in different areas such …