Global ETD Search

Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.

Results

Showing 1 to 7 of 7 for “"Breaker Failure"”.

  1. Reliability Assessment of Power Distribution Networks Incorporating Circuit Breaker Failure Modes

    … Most of the interruptions arise from the failure of components in the power distribution system. Circuit breakers (CB) are primarily used to protect the system against failure of components and disturbances in the system. A CB can randomly fail in various failure modes, such as passive …

    sask Repository record for Reliability Assessment of Power Distribution Networks Incorporating Circuit Breaker Failure Modes (opens in a new tab)

  2. Circuit breaker transient recovery voltage analysis with shunt capacitor bank configurations

    … in the selection and installation of circuit breakers with appropriate ratings. Capacitor banks with inrush current limiting reactors are an integral part of the power system. Capacitor banks with inrush reactors on the load side terminal of the capacitor breaker alter the TRV seen across the …

    texas Repository record for Circuit breaker transient recovery voltage analysis with shunt capacitor bank configurations (opens in a new tab)

  3. A NEW ACCELERATED TRIP SCHEME FOR SECOND-ZONE DISTANCE PROTECTION

    … relays protecting other transmission lines and breaker-failure relays located at the remote-end bus. This time delay limits the application of distance protection in EHV (Extra High Voltage) transmission lines due to fast fault clearance requirements of EHV power systems. It is possible to use …

    sask Repository record for A NEW ACCELERATED TRIP SCHEME FOR SECOND-ZONE DISTANCE PROTECTION (opens in a new tab)

  4. Improving Stability by Enhancing Critical Fault Clearing Time

    … (GO) and Independent Pole Operated (IPO) Breaker. An extreme event was considered as a fault scenario for the case study that consisted of three phase fault followed by breaker failure scenario. PSS®E 33.9 software was used to perform dynamic study on three different power plants to show …

    usf Repository record for Improving Stability by Enhancing Critical Fault Clearing Time (opens in a new tab)

  5. Projekt laboratorního modelu elektrické stanice s komunikací dle IEC 61850

    Práce se zaměřuje na vylepšení stávajícího modelu elektrické stanice pomocí osazení novými ochranami REF615 od společnosti ABB, které ke své horizontální komunikaci využívají GOOSE typy zpráv podle protokolu IEC 61850. V práci je dále popsán detailní postup konfigurace nových ochran REF615 pomocí …

    brno-tech Repository record for Projekt laboratorního modelu elektrické stanice s komunikací dle IEC 61850 (opens in a new tab)

  6. Ověření vývodové ochrany ABB REF615 s využitím experimentálního modelu distribuční soustavy 22 kV

    Cílem této bakalářské práce je popsat, nastavit a ověřit funkce digitální ochrany ABB REF615. Dále je práce zaměřena na ochranu z hlediska jejích ochranných funkcí a hardwarové konfigurace. Práce vás také seznámí s parametry experimentálního modelu distribuční soustavy 22 kV. Tento model byl použit …

    brno-tech Repository record for Ověření vývodové ochrany ABB REF615 s využitím experimentálního modelu distribuční soustavy 22 kV (opens in a new tab)

  7. Elektroinstalace v bytovém domě

    Bakalářská práce popisuje návrh elektroinstalace v bytových domech. Teoretická část se zabývá legislativou, hlavním domovním vedením, elektroinstalačním materiálem, silnoproudými a slaboproudými vedeními a na závěr seznamuje s chytrými domácnostmi. V této práci je část výpočtová, která vychází z …

    brno-tech Repository record for Elektroinstalace v bytovém domě (opens in a new tab)