Showing 1 to 14 of 14 for “"Bridge-Tunnel"”.
-
Analyzing Driver Behavior and Traffic Flow Breakdowns at the Hampton Roads Bridge Tunnel
The Hampton Roads Bridge Tunnel (HRBT) is a major link for activity in Hampton Roads. The eastbound direction also suffers from congestion during both morning and peak hours. During these periods of congestion, the flow rate varies in regards to the location of the congestion. This study focuses on …
-
Load Testing Deteriorated Spans of the Hampton Roads Bridge-Tunnel for Load Rating Recommendations
The Hampton Roads Bridge-Tunnel is one of the oldest prestressed concrete structures in the United States. The 3.5 mile long twin structure includes the world's first underwater tunnel between two man-made islands. Throughout its 60 years in service, the harsh environment along the Virginia coast …
-
Analysis of pressure behavior and pressure gradient in the excavation chamber of the Hampton Roads Bridge Tunnel variable density tunnel boring machine
Monitoring tunnel boring machine (TBM) face pressure using excavation chamber (EC) pressure sensors is key to maintaining face stability and preventing issues like sinkholes or losses in face pressure. However, understanding what happens inside the EC of a tunnel boring machine (TBM) is difficult …
-
Chick's Beach
… a small stretch of land by the Chesapeake Bay Bridge Tunnel.
-
The Relationship of Bottom Sediments to the Current-Generated Topography on Crumps Bank and Willoughby Bank, Southern Chesapeake Bay, Virginia
… topography. The area is bounded by two large bridge-tunnel spans, the dredged Thimble Shoal Channel borders it to the north, and the Ocean View section of Norfolk, Virginia lies to the south. The purpose of this investigation is to determine the relationship of the bottom sediments of Crumps …
-
Transportation infrastructure project cost overrun risk analysis : risk factor analysis models
… projects (budget < $0.25 million) and bridge/tunnel projects (budget >$0.85 million). However for road/highway projects with budgets over $0.25 million, cost overrun ratio decreases as project size increases. Using the VIHP database, results of a distribution fitting model and a Monte …
-
Input and Distribution of Sewage Derived Sedimentary Material Adjacent to Chesapeake-Elizabeth Sewage Outfall, Virginia Beach, Virginia
… of hydrocarbons suggest that the Bay Bridge Tunnel may be a unique source of hydrocarbons to the lower Chesapeake Bay. This study shows the usefulness of coprostanol in providing a better understanding of the fate and importance of sewage derived contaminants in the area around sewage …
-
Traffic flow management under emergency conditions in and around the Virginia Tidewater area tunnels
Most vehicular tunnels, due to their restrictive and confined environment require continuous traffic surveillance and control. This is achieved by a variety of systems like closed circuit TV monitoring, personnel stationed in the tunnel, overheight & speed detectors and others. Traffic flow data …
-
Sea Level Slopes and Volume Fluxes Produced by Atmosphere Forcing in Chesapeake Bay
… saltier and shallower location (Chesapeake Bay Bridge Tunnel). Wind forcing accounted for most of this station's variability, making up more than 67% of the variance. The wind frequency from any given direction varied from one station to another due to non-synoptic characteristics of atmospheric …
-
Integrating Probe Vehicles and Stationary Detector Data to Construct Accurate Cumulative Curves to Study Bottlenecks
… to field data collected from the Hampton Roads Bridge-Tunnel (HRBT) corridor. However, due to lack of detectors on the ramps along the corridor and gross error in the traffic data, the cumulative curve for the HRBT could not be constructed.
-
Learning from slurry circuit and excavation chamber pressure data from a 14-m diameter variable density TBM
The Hampton Roads Bridge-Tunnel project was constructed using a 14-m diameter variable density (VD) tunnel boring machine (TBM). The TBM on the job, a 14.04-m-bore Variable Density (VD) TBM that is the largest in the world to-date, was outfitted with extensive sensing of the excavation and working …
-
eHurricane Evacuation modeling - strategy evaluations and methodology enhancements
… (2) The status (open or close) of a critical tunnel crossing, the Monitor-Merrimac Memorial Bridge-Tunnel did not have impact on the evacuation performance in Category 1 and 2 storm. However, opening the tunnel would improve the performance in a Category 3 storm, (3) The clearance times …