Global ETD Search

Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.

Results 1 to 20 of 93 for “"Build Time"”

  1. Optimizing Distributed Build Time in Large Industrial Build Cluster

    … demand exceeds 20,000 requests. Distributed build clusters encounter two main challenges: resource scheduling and the absence of distributed preprocessing. Firstly, effective resource scheduling is crucial for optimizing the use of existing cluster to compile more C++ files quickly. The …

    hkust Repository record for Optimizing Distributed Build Time in Large Industrial Build Cluster (opens in a new tab)

  2. Optimum Part Build Orientation in Additive Manufacturing for Minimizing Part Errors and Build Time

    … others such as minimizing support structures, build time, build cost, energy expenditure and support structures removal.The primary cause for not achieving the design tolerances can be assigned to the staircase effect, which is inevitable in AM processes. The leading factor that affects the …

    ohiolink Repository record for Optimum Part Build Orientation in Additive Manufacturing for Minimizing Part Errors and Build Time (opens in a new tab)

  3. PROPOSED BUILD GUIDELINES FOR USE IN FUSED DEPOSITION MODELING TO REDUCE BUILD TIME AND MATERIAL VOLUME

    … process bring necessity to the development of build guidelines. This work develops a proposed set of build guidelines for use in Fused Deposition Modeling (FDM). The guidelines are verified by the literature and experience, and validated by statistical analysis of quantitative FDM build data …

    maryland Repository record for PROPOSED BUILD GUIDELINES FOR USE IN FUSED DEPOSITION MODELING TO REDUCE BUILD TIME AND MATERIAL VOLUME (opens in a new tab)

  4. Minimizing Build Time and Surface Inaccuracy of Direct Metal Laser Sintered Parts: An Artificial Intelligence Based Optimization Approach

    … track of part features. In general, parts build with thinner layers will always yield better accuracy but will take longer build time. Typically, parts built with thicker layers can be fabricated in a minimum amount of time, but at the expense of poor accuracy. The current work uses a …

    ohiolink Repository record for Minimizing Build Time and Surface Inaccuracy of Direct Metal Laser Sintered Parts: An Artificial Intelligence Based Optimization Approach (opens in a new tab)

  5. Topology Optimization for Cost and Time Minimization in Additive Manufacturing

    … high-performance designs realized on shorter timelines has fostered the need for computational design generation tools such as topology optimization. However, topology optimization has always posed the challenge of generating difficult, if not impossible to manufacture designs. The recent …

    queens Repository record for Topology Optimization for Cost and Time Minimization in Additive Manufacturing (opens in a new tab)

  6. Support structure accessibility and removal in Additive Manufacturing using octree data structure

    … occur in these parts. This leads to, increased build time for part manufacturing and additional post processing efforts for removal of supports. Support structures also affect the surface finish of regions in which they come in contact with part and many a time, removal of these supports becomes …

    ohiolink Repository record for Support structure accessibility and removal in Additive Manufacturing using octree data structure (opens in a new tab)

  7. Towards Multi-Objective Optimization of Process Parameters in Fused Deposition Modeling

    … strength, surface roughness, total cost, and build time) via symbolic regression. The framework employs the Non-dominated Sorting Genetic Algorithm II (NSGA-II) to generate Pareto-optimal solutions, which are subsequently ranked using the Technique for Order Preference by Similarity to Ideal …

    guelph Repository record for Towards Multi-Objective Optimization of Process Parameters in Fused Deposition Modeling (opens in a new tab)

  8. Enhancing GNU Radio for Hardware Accelerated Radio Design

    … and low-latency, yet the conventional build-time for FPGAs is a limiting factor for productivity. Recent research has lead to reductions in build-time by using FPGAs in a non-traditional manner, meaning productivity no longer has to be sacrificed. The AgileHW project demonstrated this …

    vt Repository record for Enhancing GNU Radio for Hardware Accelerated Radio Design (opens in a new tab)

  9. Design for the ASCE steel bridge competition

    … for the steel bridge competition. The target build time was 20 minutes, the target weight was 200 lb, the design deflection was 1 inch, and the target placement for display was top 5. The bridge's performance for the competition exceeded all design goals with a build time of 14.75 minutes, …

    santa-clara Repository record for Design for the ASCE steel bridge competition (opens in a new tab)

  10. Additive Manufacturing Optimization within a Siemens NX CAD Environment

    … contact area, sintering area and optimizing the build orientation in order to minimize these parameters for faster build time. To accomplish these tools, several algorithms have been developed. To start with, algorithms have been developed to generate support structures and their total volume …

    ohiolink Repository record for Additive Manufacturing Optimization within a Siemens NX CAD Environment (opens in a new tab)

  11. Multiple Independent Extrusion Heads for Fused Deposition Modeling

    … Material is deposited on one layer at a time so that the desired shape is built from the bottom up. While Fused Deposition Modeling has many advantages, it is poorly suited for large parts or for parts with thick walls due to the amount of time that is required to fabricate them. One …

    vt Repository record for Multiple Independent Extrusion Heads for Fused Deposition Modeling (opens in a new tab)

  12. Adaptive Slicing in Additive Manufacturing Process using a Modified Boundary Octree Data Structure

    … (reduction in staircase effect) and a reduced build time are the two most important driving factors which led to the development of different slicing algorithms. The uniform slicing approach presents a tradeoff between the part’s quality and the build time whereas current adaptive slicing …

    ohiolink Repository record for Adaptive Slicing in Additive Manufacturing Process using a Modified Boundary Octree Data Structure (opens in a new tab)

  13. Cost Estimation of Layer Additive Manufacturing using Break-down Approach

    … of additive manufacturing technique based on time and cost. The build time is calculated by studying the machine activities for preparation of a single layer on the elected process and multiplying it by the total number of layers. The methodology incorporates the yield of the AM process, the …

    ohiolink Repository record for Cost Estimation of Layer Additive Manufacturing using Break-down Approach (opens in a new tab)

  14. Optimal Placement of Metal Foils in Ultrasonic Consolidation Process

    … part strength. Finally, it is noted that the build time required for the ultrasonic consolidation process is a function of the number of bands required to form each slice. Considering these limitations and opportunities, this thesis presents an algorithm which optimally orients and places the …

    clemson Repository record for Optimal Placement of Metal Foils in Ultrasonic Consolidation Process (opens in a new tab)

  15. LESIM (LEarned Segmentation Index with Multiple pointers)

    … structure for indexing records based on their timestamps. LESIM overcomes limitations of existing index structures, and supports efficient updates at the current time, as well as point queries over the past and the present. Extensive experiments were conducted based on two common real-world …

    hkust Repository record for LESIM (LEarned Segmentation Index with Multiple pointers) (opens in a new tab)

  16. Multi-objective process planning method for Mask Projection Stereolithography

    … is a high resolution manufacturing process that builds parts layer by layer in a photopolymer. In this research, a process planning method to fabricate MPSLA parts with constraints on dimensions, surface finish and build time is formulated. As a part of this dissertation, a MPSLA system is …

    gatech Repository record for Multi-objective process planning method for Mask Projection Stereolithography (opens in a new tab)

  17. Principles for developing Time Blocks Evaluating a tool for Time Data Management at Swegon

    In contemporary industries, time data management relies heavily on traditional techniques. However, these methods are often time-consuming, expensive, and burdensome for the employees involved. This thesis addresses this challenge by exploring the concept of time blocks. The principles for …

    chalmers Repository record for Principles for developing Time Blocks Evaluating a tool for Time Data Management at Swegon (opens in a new tab)

  18. Towards an Enhanced Dependency Graph

    … changing a software application with many build-time configuration settings may introduce unexpected side effects. For example, a change intended to be specific to a platform (e.g., Windows) or product configuration (e.g., community edition) might impact other platforms or configurations. …

    waterloo Repository record for Towards an Enhanced Dependency Graph (opens in a new tab)

  19. 3-D Design for Additive Manufacturing Utilizing Topology Optimization

    … topic of 3D Topology Optimization for Cost and Time Minimization in Additive Manufacturing expands upon existing mathematical constructs by providing an algorithm to minimize the cost and time associated with AM parts. The formulation has been constructed in such a manner to accommodate topology …

    queens Repository record for 3-D Design for Additive Manufacturing Utilizing Topology Optimization (opens in a new tab)

  20. Study on the Relationship between Process Plan and Resource Requirement in Additive Manufacturing

    … AM process plan steps are emphasized and both build direction and material deposition direction are optimized while considering the resource requirement. A novel combined two-step optimization methodology is presented to determine optimal build direction for the object and material deposition …

    ndsu Repository record for Study on the Relationship between Process Plan and Resource Requirement in Additive Manufacturing (opens in a new tab)

Page 1 of 5