Global ETD Search

Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.

Results 1 to 10 of 10 for “"CMAr"”

  1. Does Design-Build (DB) Outperform Construction Management at Risk (CMAR)? A cost and schedule comparative study of DB projects and CMAR projects

    … (DB) and Construction Management at Risk (CMAR) are two widely used alternative project delivery systems in the construction industry. Previous studies have found inconclusive results on which of the two has better cost and schedule performances when applied in construction projects. This …

    tamu Repository record for Does Design-Build (DB) Outperform Construction Management at Risk (CMAR)? A cost and schedule comparative study of DB projects and CMAR projects (opens in a new tab)

  2. Performance Comparison of Design-Bid-Build (DBB), Design-Build (DB) and Construction Management-At-Risk (CMAR) Methods, and Identification of Critical Success Factors for DB and CMAR in Water and Wastewater Projects

    … delivery like Construction Management-at-Risk (CMAR) and Design-Build (DB). These approaches introduce innovation and integration into project delivery, addressing specific limitations inherent in the traditional Design-Bid-Build (DBB) method. The rise in utilization of alternative delivery …

    unlv Repository record for Performance Comparison of Design-Bid-Build (DBB), Design-Build (DB) and Construction Management-At-Risk (CMAR) Methods, and Identification of Critical Success Factors for DB and CMAR in Water and Wastewater Projects (opens in a new tab)

  3. Analysis of the Texas A&M University System's Construction Project Delivery Method Performance: CMAR and CSP

    … the use of construction manager-at-risk (CMAR) has surged as an innovative construction project delivery method in comparison to traditional competitive bid procurement methods. The conceptual pros and cons of the method are widely accepted throughout the construction industry; however, …

    tamu Repository record for Analysis of the Texas A&M University System's Construction Project Delivery Method Performance: CMAR and CSP (opens in a new tab)

  4. Testing purebred and commercial combined selection in Angus: Tri-County Steer Carcass Futurity

    … 12th rib (CFAT), marbling score at the 12th rib (CMAR) and ribeye area at the12th rib (CREA). Purebred data from the American Angus Association (AAA) included records of 139,602 bulls, 130,944 heifers and 6,656 steers for weaning weight (WW); 85,702 bulls, 76,603 heifers and 1,908 steers for …

    vt Repository record for Testing purebred and commercial combined selection in Angus: Tri-County Steer Carcass Futurity (opens in a new tab)

  5. Design-Build and CM at Risk- comparative analysis for owner decision making based on case studies and project surveys

    … to compare the efficiency of DB with that of CMAR, as two methods used to select or deny expectations, specifically through quantitative and qualitative analysis. In order to do that, the researcher identified performance data and benefits, drawbacks, and success factors of DB and CMAR through …

    tamu Repository record for Design-Build and CM at Risk- comparative analysis for owner decision making based on case studies and project surveys (opens in a new tab)

  6. Du doute à la vérification : étude comportementale et électrophysiologique de la prise de décision chez le primate non-humain

    … extracellulaires unitaires au niveau de CMAr et pré-SMA, nous avons pu montrer que : (i) les singes ont les capacités métacognitives d’exprimer un comportement volontaire de vérification similaire à celui observé chez l’Homme, (ii) ce comportement est sous tendu par l’émergence du doute, …

    star-france Repository record for Du doute à la vérification : étude comportementale et électrophysiologique de la prise de décision chez le primate non-humain (opens in a new tab)

  7. Effect of the Combination of Management Theory and the Project Delivery System on the Cost and Schedule of a Construction Project

    … Build (DB) and Construction Management at Risk (CMAR) for commercial projects. The research objectives were achieved through a combination of qualitative and quantitative methods. A thorough review of the existing literature on these topics and statistical analysis of data are steps taken to …

    tamu Repository record for Effect of the Combination of Management Theory and the Project Delivery System on the Cost and Schedule of a Construction Project (opens in a new tab)

  8. Construction delivery methods in the United States Air Force

    … design-build (DB), construction manager at risk (CMAR), and integrated project delivery (IPD). A literary review of previous studies on the aforementioned construction delivery methods, particularly regarding studies performed within the United States (US) federal government and US military …

    ksu Repository record for Construction delivery methods in the United States Air Force (opens in a new tab)

  9. Properties of forelimb muscle representations in the primate cerebral cortex

    … rostral cingulate motor areas (CMAd, CMAv, and CMAr), and the dorsal and the ventral premotor areas (PMd and PMv). Extensive data on the properties of M1 have already been published, and the direct linkage of its corticospinal neurons on motoneurons has been demonstrated. While the location and …

    ku Repository record for Properties of forelimb muscle representations in the primate cerebral cortex (opens in a new tab)