Global ETD Search
Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.
Results 1 to 20 of 34 for “"Cemented Paste Backfill (CPB)"”
-
Unsaturated Flow in Hydrating Porous Media: Application to Cemented Paste Backfill
… is contingent upon delivering a high quality cemented paste backfill (CPB) that is self-sustaining during ore recovery. The integrity of CPB systems hinges on how quickly in excess pore-water pressures (PWPs) dissipates. Consolidation and self-desiccation are critical factors that determine …
-
Geotechnical properties of cemented paste backfill and tailings liners: Effect of mix components and temperature
Cemented Paste Backfill (CPB) is extensively used in underground mine operations. Several studies have been conducted to investigate the mechanical properties of CPB. However, little attention has been devoted to the thermal conductivity of CPB. The knowledge of this thermal property is vital for …
-
Early Age Mechanical Behavior and Stiffness Development of Cemented Paste Backfill with Sand
Rapid delivery of backfill to support underground openings attracted many mines to adopt paste backfilling methods. As a precaution to prevent liquefaction and to improve the mechanical performance of backfills, a small portion of a binder is added to the paste to form the cemented paste backfill …
-
Strength and Fresh Properties of Cemented Paste Backfill with a Low-Carbon Binder
Cemented paste backfill (CPB) is widely used in underground mining to provide ground support and enable the safe disposal of tailings. Ordinary Portland cement (OPC), commonly employed as the binder in CPB, is associated with high energy consumption and significant CO₂ emissions, motivating the …
-
Strength and Deformation Behaviour of Cemented Paste Backfill in Sub-zero Environment
… to remedy both (the voids and the waste) is cemented paste backfill (CPB), which is gaining increased recognition in both the mining industry and academic research. Transforming tailings into cemented paste, and transporting this back to underground stopes, not only negates these safety …
-
NUMERICAL ANALYSIS OF STRESS DISTRIBUTIONS FOR MULTIPLE BACKFILLED STOPES
… technological innovations with respect to cemented paste backfill (CPB) as a means of ground support has allowed for increased production within the mining industry, management mine waste costs, as well as the improvement of the overall health and safety of underground mining operations. …
-
Effects of Transient Hydro-mechanical Cemented Paste Tailings Properties on One-dimensional Deposition Behaviour
When underground mining voids are filled with Cemented Paste Backfill (CPB) a dynamic interaction occurs between the hydrating CPB's engineering properties (hydraulic conductivity, stiffness and strength) and the fill rise rate, drainage conditions, and underground atmospheric conditions. These …
-
A Design Procedure for Determining the In Situ Stresses of Early Age Cemented Paste Backfill
… optimize ore extraction, a material is used to backfill these openings prior to creating any adjacent openings. The use of cemented paste backfill (CPB), a mixture of mine tails, water, and cement binder, has gained prominence as it not only provides a material that has engineered strength and …
-
Experimental Study of Physical and Mechanical Properties of a Cemented Mine Tailings
The mechanical properties and behavior of mine backfill need to be better understood in order to increase the reliability of engineered backfill designs in deep and high stress mining conditions. The thesis makes a detailed examination of Cemented Paste Backfill (CPB) from the Williams mine with a …
-
Design guidelines : underhand cut and fill cemented paste backfill sill beams
… Ultimately, the operations require the minimum cemented paste backfill (CPB) strength for a stable span. Operational concerns were addressed by a multi-prong approach investigating stability of CPB sill beams using observational, experimental and analytical techniques. A case study approach …
-
Liquefaction of Early Age Cemented Paste Backfill
Modern mines require systems that quickly deliver backfill to support the rock mass surrounding underground openings. Cemented Paste Backfill (CPB) is one such backfilling method, but concerns have been raised about CPB’s liquefaction susceptibility especially when the material has just been …
-
Classification and utilization of different types of mine tailings: An environmental perspective
… the mining area but are frequently used as cemented paste backfill (CPB) materials to fill mining cavities. The stabilization of HMT requires large amounts of cement, the production of which is known to result in carbon dioxide emissions. Hence, there is a need to replace cement with …
-
Engineering Properties of Cemented Paste Backfill Under Loading, Mixing, and Curing Conditions
… challenges. To overcome these issues, various backfilling techniques have been developed, among which Cemented Paste Backfill (CPB) has emerged as an essential practice in modern underground mining. CPB provides ground support, reduces surface tailings disposal, and facilitates safer, more …
-
A study of pyrite reactivity and the chemical stability of cemented paste backfill
… the weathering characteristics of various paste backfill mixtures that contain pyritic tailings, when exposed to leaching environments similar to those encountered in mine settings. Pyrite leaching experiments were carried out on 6 different pyrite samples from existing mines. Cyclic …
-
Rheological Properties and Permeability Properties of Cemented and Uncemented High-Density Paste Tailings: Effect of Sulphide Minerals
… been developed. Among the emerging approaches, paste tailings (PT) technology has emerged as a sustainable solution as it repurposes tailings into a dense, often cemented material that provides structural support for underground excavations, enhances storage stability, and mitigates acid mine …
-
Multiphysics Investigation of the Geotechnical Behaviour of Cemented Paste Backfill with Superplasticizer
The cemented paste backfill (CPB) method finds extensive application in the mining industry as an effective technique to manage mining wastes (tailings) and support underground mine excavations. In this technique, substantial quantities of tailings are repurposed and transformed into a cemented …
-
Strength and Environmental Properties of Cemented Paste Backfill That Contains Sodium Silicate
… require filling, typically with an engineering backfill material. Filling the voids with mine waste materials provides an environmental-friendly way of disposing mining waste. It is also an effective way of increasing ore recovery and improving the safety of miners. One of the best techniques of …
-
Temperature Dependence of the Leachability of Cemented Paste Backfill
… adopted by the mining industry in many forms. Cemented paste backfill (CPB) is a common best management practice developed to tackle these two specific resource industry related issues worldwide. CPB is a cement-stabilized material composed of tailings, water, and hydraulic binder. Tailings …
-
Strength of Nano-Cemented Paste Backfill Cured in Iso- and Non-Isothermal Conditions
… a result of stricter environmental regulations, cemented paste backfilling has been developed as a solution. This relatively new technology uses the produced waste tailings to backfill the mine stopes, greatly reducing their environmental impact while offering proper structural support in an …
-
Reactivity of Cemented Paste Backfill
… the several different types of methods used, cemented paste backfilling is one of the technologies that offers good management practices for the disposal of tailings in underground mines worldwide. Cemented paste backfill (CPB) is a cementitious composite made from a mixture of mine tailings, …
Page 1 of 2