Recommendation for an interface system for product related computer data to enhance the Engineering Change Order/Preliminary Change Order function
… technical benefits attainable in the Engineering Change Order/Preliminary Change Order function. Information is the foundation of today's corporate enterprise. An organization's success can depend on how effectively it identifies, manages and uses its information. As an organization grows or …
-
An analysis of navy construction contract change order audits.
… in the negotiation of Navy construction contract change orders. A survey was conducted to determine how audits are currently used and to solicit suggestions on how current procedures might be improved. Analysis of the response identified five recommendations for consideration by policy-making …
-
Investigation of legal criteria governing notice requirements and oral change order disputes
… disputes involving notice requirements and oral change orders. The current construction contract law literature directed at the construction contract administrator is reviewed and synopsized. The purpose of the applicable contract requirements and relevant issues are discussed. Rules of …
-
CBR-Based Algorithm for Identifying Potential Change Order Items in Highway Projects
… of transportation (DOTs) highway projects, change orders are inevitable. They often result in unexpected project costs and schedule extensions, posing significant risks and negative impacts on project productivity. The uncertainty and complexities introduced by change orders necessitate …
-
A framework for reducing change order processing time in university construction projects
Thesis (M.S.)--Michigan State University. Construction Management Program School of Planning, Design and Construction, 2005
-
Quantifying the Effectiveness of Innovative Contracting Strategies on Schedule, Cost and Change Order
… impact of contracting strategies on dealing with change orders 2) to evaluate the performance of different contracting strategies under varied work type for the state of Florida . For this research the study was conducted to quantify the changes to project duration and cost caused by change orders …
-
Data-informed Change Order Risk Management in Transportation Infrastructure Using AI-Enabled Insights
This dissertation investigates how persistent change orders in transportation infrastructure projects can be more systematically understood and managed through data-driven analytical approaches. Using project-level data from a state department of transportation in the United States, it integrates …
-
A comparison of the basket method and stratified random sampling for contract change order negotiations
… in expediting processing of proposals for change orders while maintaining acceptable levels of risk. The Basket Method and Stratified Random Sampling techniques are examined to determine with method slows a more accurate estimate of a proposal population to be made. The several populations …
-
Development of preconstruction change order prevention strategies for reducing design errors and omissions in university projects
Thesis (M.S.)--Michigan State University. Construction Management Program, 2005
-
Change order insurance policy (COIP) in the U.S. design and construction industry: Is there any likelihood of acceptance?
… and for a long period of time, the issue of change orders poses as an undesirable problem in maintaining the efficiency and cost of construction projects. This research study will investigate a new mechanism for dealing with such problems. Accordingly, it will propose sharing the risk of cost …
-
Prediction Of Cost and Schedule Changes in Transportation Projects Through Historical Bid and Change Order Document Analysis – Using Oklahoma Dot Project Cases.
… (RFI) and quantifies project cost and schedule changes from change order documents. This study has two primary objectives: 1) identifying substantial bid document-related risks and 2) developing an automated model using Natural Language Processing (NLP) to assess cost and schedule changes for …
-
Developing a specification for a computer-based decision support environment for managing change orders in construction projects
… support environment for managing construction change orders and to visualize and interpret change order data to describe project performance as a function of change orders. The detailed conceptual development of a change management view is followed by the design of visualization techniques to …
-
Quantifying Causes, Schedule, and Cost Impacts of Change Orders: "Is Alternative Contracting Really Effective?"
… that the project cannot be delivered with no change. Regardless of considering different contract methods or what so ever, contract change orders (CCO) are yet inevitable due to unforeseen utility conflicts, unpredicted geology, and other unanticipated conditions. No matter of the project …
-
Analysis of overpricing of maintenance service contracts awarded via the 8(a)program and by formal advertising.
… This thesis examines overpricing from a total change order rate perspective for 8(a) and formally advertised maintenance service. From the data accumulated for this study, it was determined that the change order rates were comparable.
-
The impact of building information modeling (BIM) on change orders for university construction projects
… for improvement in the construction process. Change orders have a significant impact on project cost and schedule; therefore they are in need of improvement. Researchers have worked on improving the change order management and prevention plan and implementing it into their construction …
-
Does Design-Build (DB) Outperform Construction Management at Risk (CMAR)? A cost and schedule comparative study of DB projects and CMAR projects
… projects. This study chose unit cost, change order factor, cost growth, schedule growth, and construction intensity as the metrics to measure the cost and schedule performance of both DB projects and CMAR projects. Two statistical analysis tools, Analysis of Variance and Wilcoxon Signed …
-
Impact of Disadvantaged Business Enterprises Participation and Mobilization Cost on Highway Project Performance
… supervision and communication, design changes, and unskilled workers. In some studies, mobilization costs, along with the participation of Disadvantaged Business Enterprises (DBEs) in projects were identified as factors affecting the cost and schedule performance of construction …
-
Dynamic Modeling Approach to Quantify Change Orders Impact on Labor Productivity
In construction projects, change orders are commonly faced. These change orders, which are issued by the owner, may cause interruption to the contractor's work, resulting in damages such as loss of labor productivity, delay damages, and cost overruns which may lead to claims. The relationship …