Global ETD Search

Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.

Results

Showing 1 to 16 of 16 for “"Change request"”.

  1. Change Request Prediction and Effort Estimation in an Evolving Software System

    … Modern software engineering databases contain Change Requests (CR), which include both defects and other maintenance requests. Our goal is to use defect prediction methods to help predict CRs in an evolving legacy system. Limited research has been done in defect prediction using curve-fitting …

    denver Repository record for Change Request Prediction and Effort Estimation in an Evolving Software System (opens in a new tab)

  2. Aplikace změnového řízení v prostředí SAP

    … využita standardní SAP komponenta Personnel Change Request. Aplikace jsou oprávněným žadatelům o konkrétní změnu přístupné přes SAP NetWeaver Portal. Schvalovatelé se vyjadřují k požadavkům prostřednictvím komponenty Universal Worklist na SAP NetWeaver Portal. Požadavky, které vyžadují …

    brno-tech Repository record for Aplikace změnového řízení v prostředí SAP (opens in a new tab)

  3. (Re)Integrating Rammed Earth Construction : Regulatory and Material Challenges and Opportunities of Rammed Earth Construction in Ontario

    … building digital models, submitting a Code Change Request for the NBCC, proposing a Rammed Earth Standard for Ontario, and creating a Rammed Earth Student Guidebook.

    carleton Repository record for (Re)Integrating Rammed Earth Construction : Regulatory and Material Challenges and Opportunities of Rammed Earth Construction in Ontario (opens in a new tab)

  4. Integrating Software Issue Tracking and Traceability Models

    … (MDE) where traceability is integrated into Change Request (CR) management. In this process, traceability is managed with the status of the CR; for example, traceability is used to report the progress of the implementation of a CR. The proof of concept of the integrated process is …

    mcmaster Repository record for Integrating Software Issue Tracking and Traceability Models (opens in a new tab)

  5. An Analogy Based Technique for Predicting the Vector Impact of Software Change Requests

    Managing the impact of software change request (CR) requires proper prediction to minimize cost and enhance quality. Traditional techniques only identify source code entities likely to be impacted by the implementation of CR. However, looking at code entity is not enough. To ensure maximum utility …

    calgary Repository record for An Analogy Based Technique for Predicting the Vector Impact of Software Change Requests (opens in a new tab)

  6. Change Impact Analysis in Simulink Designs of Embedded Systems

    … the \emph{Boundary Diagram Tool}, a tool for change impact analysis of large Simulink designs of embedded systems. The Boundary Diagram Tool extends the Reach/Coreach Tool, an existing tool for model slicing within a single Simulink model, to trace the impact of model changes through multiple …

    mcmaster Repository record for Change Impact Analysis in Simulink Designs of Embedded Systems (opens in a new tab)

  7. Modeling Software Developer Expertise and Inexpertise to Handle Diverse Information Needs

    … such as fixing a bug report or helping with a change request. But not all expertise needs can be easily classified into one of these groups, and having different techniques for every possible task type would be difficult and confusing to maintain and use. We find that inexpertise exists, can be …

    vt Repository record for Modeling Software Developer Expertise and Inexpertise to Handle Diverse Information Needs (opens in a new tab)

  8. Investigation into the efficiency of a PLM system

    … (PLM) system, with a focus on Engineering Change Requests (ECRs). A total of 166 ECRs were collected, categorized into four distinct cases, and analyzed to understand process times, task distribution, outlier occurrences, and iterative work. Data was manually gathered and visualized using …

    chalmers Repository record for Investigation into the efficiency of a PLM system (opens in a new tab)

  9. Discovering and Tracking Interesting Web Services

    … encoding to provide efficient and scalable change monitoring for arbitrary Web documents through document compartmentalization and semantic change request grouping. Finally, we present XPack, an XML document compression system that uses a containerized view of an XML document to provide both …

    gatech Repository record for Discovering and Tracking Interesting Web Services (opens in a new tab)

  10. Supporting Source Code Search with Context-Aware and Semantics-Driven Query Reformulation

    … hundreds of new features by making necessary changes to the existing software code. Once an issue report (e.g., bug report, change request) is assigned to a developer, she chooses a few important keywords from the report as a search query, and then attempts to find out the exact locations in …

    sask Repository record for Supporting Source Code Search with Context-Aware and Semantics-Driven Query Reformulation (opens in a new tab)

  11. A Model for Implementing an Automated Change Management Process for Construction Mega-projects

    … and continuously improving the automated change management process for construction megaprojects. Changes are inevitable in megaprojects. Their negative impact along with the necessity of the circulation of numerous change documents, such as; Request For Information (RFIs), Change Request …

    waterloo Repository record for A Model for Implementing an Automated Change Management Process for Construction Mega-projects (opens in a new tab)

  12. Explanatory and Causality Analysis in Software Engineering

    … the highest direct effect came from the change request, while changing the code had a minor impact on software faults. The highest impact of the code change resulted from the change requests (either for bug fixing or refactoring). Interestingly, the indirect impact from code …

    wvu Repository record for Explanatory and Causality Analysis in Software Engineering (opens in a new tab)

  13. Requirement elicitation using knowledge capturing (KC) techniques during the client briefing process for improved client satisfaction in the UK construction industry

    … from initial 75% in 2009. Variations and Design changes which is as a result of change request or mistakes during requirement elicitation are the main reason for cost and time overruns. Statistics show that over 70% of construction projects suffer re-work and changes and this is largely caused by …

    salford Download PDF for Requirement elicitation using knowledge capturing (KC) techniques during the client briefing process for improved client satisfaction in the UK construction industry (opens in a new tab)

  14. An assessment of the effectiveness of the private plan change process

    … assesses the effectiveness of the private plan change mechanism, being a new tool introduced into the planning legislation under the Resource Management Act 1991. Prior to this legislation there was no formal opportunity for individuals to prepare their own changes to a plan and the only way a …

    lincoln Repository record for An assessment of the effectiveness of the private plan change process (opens in a new tab)

  15. ERCOT ancillary services and wind generation : the factors that influence the requirements

    … design that have influenced service requirement changes over the years. The CPS1 and contingency reserve requirements from NERC BAL Standards are introduced. The ERCOT ancillary services and the progression of the values from 2007 to 2016 are presented in the report. ERCOT’s economic dispatch and …

    texas Repository record for ERCOT ancillary services and wind generation : the factors that influence the requirements (opens in a new tab)

  16. Aplicación de estándares globales de PMI al Planeamiento del Proyecto de irrigación: Ampliación y mejoramiento de la campiña en Caylloma, Departamento de Arequipa

    El PMI (Project Management Institute) establece estándares globales en la gestión de proyectos a través de su marco de referencia, el PMBOK (Project Management Body of Knowledge), que es ampliamente reconocido y utilizado en todo el mundo, de acuerdo a ello nace la necesidad de establecer una …

    upc-peru Repository record for Aplicación de estándares globales de PMI al Planeamiento del Proyecto de irrigación: Ampliación y mejoramiento de la campiña en Caylloma, Departamento de Arequipa (opens in a new tab)