Global ETD Search

Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.

Results

Showing 1 to 4 of 4 for “"Clash Resolution"”.

  1. Clash Resolution Optimization based on Component and Clash Dependent Networks

    … its most widely used applications is automatic clash detection. The realistic visualization function of BIM helps reduce ambiguity and expedites clash detection. However, many project participants criticize automatic clash detection, as many detected clashes are irrelevant with no significant …

    gatech Repository record for Clash Resolution Optimization based on Component and Clash Dependent Networks (opens in a new tab)

  2. A Supervised-Reinforcement Learning Model for Automated Clash Resolution in the Construction Industry

    Clash Coordination is a crucial step in ensuring timely and cost-effective project delivery. While software tools like Navisworks and Solibri have improved the process of aggregating models and conducting clash tests and categorization, resolving clashes remains a slow and manual task. The reason …

    vt Repository record for A Supervised-Reinforcement Learning Model for Automated Clash Resolution in the Construction Industry (opens in a new tab)

  3. A graph-based method for semi-automating clash grouping and resolution in BIM-based multidisciplinary coordination

    … Modeling (BIM) is widely used for automated clash detection, clash resolution remains largely manual and time-consuming, limiting the effectiveness of current BIM-based coordination workflows. This research presents a method that makes clash management more effective by using both BIM data …

    ets-quebec Download PDF for A graph-based method for semi-automating clash grouping and resolution in BIM-based multidisciplinary coordination (opens in a new tab)

  4. Non-Deterministic Workspace Simulation and Management in Construction

    … of modelling the propagating effects of 4D-clashes on schedule progress; and not accounting for the unpredictability of crews’ decisions for resolving a 4D-clash. Additionally, the recent pandemic exacerbated vulnerabilities with the need to implement physical distancing, which created a new …

    concordia Download PDF for Non-Deterministic Workspace Simulation and Management in Construction (opens in a new tab)