Global ETD Search

Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.

Results

Showing 1 to 3 of 3 for “"Combined cycle unit"”.

  1. Integration and Simulation of a Bitumen Upgrading Facility and an IGCC Process with Carbon Capture

    … an upgrading and integrated gasification combined cycle then to evaluate the feasibility of integrating slurry hydrocracking, trickle-bed hydrotreating and residue gasification using the Aspen HYSYS® simulation software. The close-coupling of the bitumen upgrading facilities with …

    ottawa-retro Repository record for Integration and Simulation of a Bitumen Upgrading Facility and an IGCC Process with Carbon Capture (opens in a new tab)

  2. Mixed-integer programming in power systems : the interdiction and unit commitment problems

    … problems namely, an interdiction problem and a unit commitment problem, are formulated and solved with MIP techniques. The studies presented in this dissertation focus on extracting the special features embedded in the problems and formulating the problems such that they can be solved using the …

    texas Repository record for Mixed-integer programming in power systems : the interdiction and unit commitment problems (opens in a new tab)

  3. Parní turbína pro paroplynový blok

    Diplomová práce se zabývá návrhem kondenzační parní turbíny pro paroplynový cyklus. Tento cyklus je tvořen plynovou turbínou se zadanými parametry, jejíž spaliny jsou využity v HRSG kotli, kde je generována admisní pára pro parní turbínu. Parní turbína pracuje ve dvou provozních režimech – v zimním …

    brno-tech Repository record for Parní turbína pro paroplynový blok (opens in a new tab)