Global ETD Search
Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.
Results
Showing 1 to 7 of 7 for “"Conceptual Estimate"”.
-
Comparing Time and Accuracy of Building Information Modeling to On-Screen Takeoff for a Quantity Takeoff of a Conceptual Estimate
… project. The most tedious component of an estimate is the quantity takeoff. Different tools are available to improve an estimator's productivity for a quantity takeoff. Faster quantity takeoffs enable estimator to bid more jobs. This study analyzed the time and accuracy of performing …
-
Parametric cost estimating model for conceptual cost estimating of building construction projects
… for these important decisions is the project’s conceptual cost estimate. It is the first serious effort at attempting to predict the cost of the project. Conceptual estimates are made in the early phases of a project before construction drawings are completed, often before they are begun. The …
-
The Framework of a Multi-Level Database of Highway Construction Performance Times
… the VDOT cost estimating process, refining estimates as design details become available along the Project Development Concurrent Engineering Process (PDCEP). Three distinct stages exist along the PDCEP that will facilitate the use of a tool for estimating contract time. Sufficient …
-
Integrated conceptual cost estimating and life cycle costing system for building projects
Cost estimates are considered the most important and critical mission during the life cycle of a construction project. Preparing reliable and accurate estimates to help decision makers is the most challenging assignment that cost engineers and estimators can face. For decades, the construction …
-
Applying artificial neural networks to top-down construction cost estimating of highway projects at the conceptual stage
<p>Conceptual cost estimating (CCE) is a challenging task for highway agencies due to the limited design information available at early stages of project development. As a result, agencies frequently experience large variance from the initial construction estimate to the final cost. Despite the …
-
A conceptual cost estimation model for the pre-design stage of road projects in New Zealand : a thesis presented in partial fulfilment of the requirements for the degree of Doctor of Philosophy (PhD) in Construction, School of Built Environment, Massey University, Auckland, New Zealand
… cost overrun issue by minimising the errors in conceptual cost estimation by developing a new cost model for the pre-design stage of road projects. This research followed a secondary data collection through systematic and bibliometric literature review and primary data collection from the New …
-
A Machine Learning Framework for Early-Stage Cost Estimation of Transportation Projects
… as key predictors. In both frameworks, the final estimates are computed by aggregating multiple estimates produced by county-, region-, and state-level models. The resurfacing framework produced more stable results, with an overall MAPE of 32.45% and MPE of -1%. The construction framework showed …