Global ETD Search

Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.

Results 1 to 20 of 127 for “"Concrete girders"”

  1. Deflection Minimization of Prestressed Concrete Girders

    When constructing prestressed concrete girder bridge structures, the high initial pretensioned force at the bottom of the girder causes it to camber upwards. This hogging of girders may be reduced slightly after casting the deck slab, any residual camber becomes locked-in. The upward deflection is …

    tamu Repository record for Deflection Minimization of Prestressed Concrete Girders (opens in a new tab)

  2. Behavioral Study of Ultra High Performance Concrete Girders

    Ultra High Performance Concrete (UHPC) is one of the newer and superior classes of concrete that can be used to develop improved bridges capable of meeting the present and future traffic, environmental, maintenance and economical requirements. Developing on the superior material properties of UHPC, …

    maryland Repository record for Behavioral Study of Ultra High Performance Concrete Girders (opens in a new tab)

  3. Shear Strength Assessment of Corrosion-Damaged Prestressed Concrete Girders

    Corrosion is a concern in old prestressed concrete bridges, especially bridges built in marine environments. Corrosion induces cracks in the concrete superstructure which accelerates the deterioration rate and can result in a complete loss of the concrete cover and exposure of the reinforcing and …

    vt Repository record for Shear Strength Assessment of Corrosion-Damaged Prestressed Concrete Girders (opens in a new tab)

  4. Evaluating Shear Capacity of Concrete Girders with Deficient Shear Reinforcement

    … for predicting the shear capacity of reinforced concrete members which do not comply with S6-06 Section 14 stirrup spacing and area requirements. The results of the evaluations indicate that the sectional shear provisions in S6-06, AASHTO LRFD-05 and software Response 2000 appropriately account …

    alberta Repository record for Evaluating Shear Capacity of Concrete Girders with Deficient Shear Reinforcement (opens in a new tab)

  5. Direct shear behavior of composite concrete girders with tall haunches

    Composite bridges constructed using prestressed concrete (PSC) girders and concrete slabs may require haunches—a region of concrete that connects the bridge deck and girders—to maintain a uniform deck thickness despite camber, cross-slope, construction errors, and perhaps other reasons. The Texas …

    texas Repository record for Direct shear behavior of composite concrete girders with tall haunches (opens in a new tab)

  6. Strength of Prestressed Concrete Girders with Bonded and Unbonded Strands

    … during the service life for prestressed concrete members. There are two challenges associated with the use of unbonded or combined strands: 1) flexural analysis requires displacement compatibility due to lack of bond between concrete and strands, and predicting the displacement of …

    buffalo Repository record for Strength of Prestressed Concrete Girders with Bonded and Unbonded Strands (opens in a new tab)

  7. Full-Scale Testing of Pretensioned Concrete Girders with Partially Debonded Strands

    … is an option for reducing extreme-fiber concrete tensile stress and splitting forces in the end regions of pretensioned concrete beams. The prestressing force in partially debonded strands is transferred to the concrete at a distance from the end regions. In this manner, the total …

    ohiolink Repository record for Full-Scale Testing of Pretensioned Concrete Girders with Partially Debonded Strands (opens in a new tab)

  8. CONNECTION BETWEEN SIMPLE SPAN PRECAST CONCRETE GIRDERS MADE CONTINUOUS-EMBEDDED CONNECTIONS

    Precast prestressed concrete girders have been used in bridge construction for several years in the United States. In general, these types of bridges have performed well in service conditions. Although the connections over the supports provide sufficient continuity for dead loads, which cause …

    ohiolink Repository record for CONNECTION BETWEEN SIMPLE SPAN PRECAST CONCRETE GIRDERS MADE CONTINUOUS-EMBEDDED CONNECTIONS (opens in a new tab)

  9. CONNECTION BETWEEN SIMPLE SPAN PRECAST CONCRETE GIRDERS MADE CONTINUOUS-MODIFIED CONNECTIONS

    … bridges are formed by placing the girders end to end and then pouring a slab and intermediate diaphragms. The girders carry the dead load of the structure as simple spans but are continuous for live loads. These connections provide sufficient negative moment continuity, however …

    ohiolink Repository record for CONNECTION BETWEEN SIMPLE SPAN PRECAST CONCRETE GIRDERS MADE CONTINUOUS-MODIFIED CONNECTIONS (opens in a new tab)

  10. POST-TENSIONING TO PREVENT END-REGION CRACKS IN PRETENSIONED CONCRETE GIRDERS

    … transfer is a common problem in pretensioned concrete beams, often with lasting effects on the durability and performance. By providing an entry point for chlorides and other corrosives, end-region cracks enable degradation of reinforcing steel and further cracking. Current practices offer a …

    clemson Repository record for POST-TENSIONING TO PREVENT END-REGION CRACKS IN PRETENSIONED CONCRETE GIRDERS (opens in a new tab)

  11. Performance of segmental post-tensioned concrete girders with minimum flexural reinforcement

    … will focus on the segmental post-tensioned concrete girder experimental study conducted as part of NCHRP 12-94. These test girders were designed at various reinforcement amounts, both above and below the minimum reinforcement requirement. The objective of this thesis is to establish better …

    iastate Repository record for Performance of segmental post-tensioned concrete girders with minimum flexural reinforcement (opens in a new tab)

  12. CONSTRUCTABILITY ISSUES FOR CONNECTION BETWEEN SIMPLE SPAN PRECAST CONCRETE GIRDERS MADE CONTINUOUS

    Constructability implementation right from project conception to completion results in gains to owners, designers, fabricators, and contractors in terms of time and cost without compromising on quality. Constructability implementation optimizes all the phases of a construction project including …

    ohiolink Repository record for CONSTRUCTABILITY ISSUES FOR CONNECTION BETWEEN SIMPLE SPAN PRECAST CONCRETE GIRDERS MADE CONTINUOUS (opens in a new tab)

  13. Simplified Modeling of Bonded Prestressed High Strength Concrete Girders during Fire Exposure

    … behavior of bonded prestressed high-strength concrete sections exposed to fire. The model starts by predicting the temperature distribution within a structural element using 2-D finite difference analysis. It then uses one-dimensional sectional analysis to estimate the section behavior. The …

    uwo Repository record for Simplified Modeling of Bonded Prestressed High Strength Concrete Girders during Fire Exposure (opens in a new tab)

  14. Shear stress evaluation and limits for the prestressed concrete girders end region

    … of end regions of various types of pretensioned concrete girders. The proposed analytical models account for differences in geometry and boundary conditions across girder types. The research comprises experimental testing, finite element analysis, database analysis, and analytical evaluations of …

    texas Repository record for Shear stress evaluation and limits for the prestressed concrete girders end region (opens in a new tab)

  15. Experimental testing of prestressed concrete girders for evaluation of stability during construction

    … related to the stability behavior of prestressed concrete girders utilized in bridge applications. The impetus for the study is assessing the behavior of concrete girders during construction for concrete girders utilized in spliced girder systems, which are seeing increased use in Texas. The …

    texas Repository record for Experimental testing of prestressed concrete girders for evaluation of stability during construction (opens in a new tab)

  16. Repair of impact damaged prestressed concrete girders using carbon fiber reinforced polymers

    Every year several prestressed concrete (P/C) girder bridges are damaged by overheight vehicles. Traditional P/C girder repair strategies include beam replacement, internal strand splices, external post-tensioning, and welded steel jackets. Unfortunately, these types of repairs are both labor …

    iastate Repository record for Repair of impact damaged prestressed concrete girders using carbon fiber reinforced polymers (opens in a new tab)

  17. Shear Strength Assessment of Corrosion-Damaged Prestressed Concrete Girders Repaired With CFRP

    … in the end regions of the beams, failure of the girders will likely be in shear, which is a sudden failure mode and not the preferred limit state. Therefore, it is beneficial to study repair practices and their advantages, as repairs are often more cost-effective than building entirely new …

    vt Repository record for Shear Strength Assessment of Corrosion-Damaged Prestressed Concrete Girders Repaired With CFRP (opens in a new tab)

Page 1 of 7