Global ETD Search

Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.

Results

Showing 1 to 2 of 2 for “"Connaught Tunnel"”.

  1. The C.P.R.’s capacity and investment strategy in Rogers Pass, B.C., 1882-1916

    … costs, or whether to invest in an 8.9-mile tunnel which, by reducing the gradient against westbound traffic, will stem congestion and reduce the level of operating costs in future years. CP Rail must make a trade-off between construction costs and operating costs. The Company has made such a …

    ubc Repository record for The C.P.R.’s capacity and investment strategy in Rogers Pass, B.C., 1882-1916 (opens in a new tab) Download PDF for The C.P.R.’s capacity and investment strategy in Rogers Pass, B.C., 1882-1916 (opens in a new tab)

  2. Tracks, tunnels and trestles: an environmental history of the construction of the Canadian Pacific Railway

    The construction of the Canadian Pacific Railway (CPR) was not a conquest of man over nature as some historians have suggested and the driving of the last spike did not cement that victory. By studying the CPR from an environmental perspective, it becomes obvious that the relationship between the …

    uvic Repository record for Tracks, tunnels and trestles: an environmental history of the construction of the Canadian Pacific Railway (opens in a new tab)