DECISION ANALYSIS IN CONSTRUCTION CLAIMS
Claims in construction projects are inevitable and can result in costly litigation. Construction contract ambiguity, overly restrictive terms, and unfairly allocated risks are among the factors increasing the likelihood of conflict between parties in construction claims. The source of conflict is a …
-
Front End Specifications and the Propagation of Construction Claims
… performance and payment requirements for construction projects. The vast majority of construction contracts use Front End Specifications, either from an independent source or prepared in-house. In spite of the crucial role of Front End Specifications, little is known regarding whether …
-
Effective contract drafting for the avoidance and resolution of construction claims
<p>The subject of construction claims avoidance and resolution is a complex issue. Many thoughts and ideas on this topic can be debated as to both their applicability and legal viability. Claims resolution and avoidance are, however, primary concerns for many project owners. The ability to minimize …
-
State of the art of state departments of transportation construction claims procedures
… of Transportation procedures for highway construction claims. A questionnaire was developed and sent to the fifty state Departments of Transportation to gather information. Once the responses were received, the data were analyzed to determine the procedures currently used by the state …
-
Construction claims in Saudi Arabia : a study of sources and associations of claims
The construction industry is a complex one involving the participation of several parties, each with its own aims from getting into a project. The difference in these aims is one basic factor leading to conflicts and claims. Ownership of projects is split between government (public) and private …
-
Characteristics and causal factors of claims in michigan highway construction projects
… of resources. The number and cost of these construction claims has been substantially increasing in recent years. Research on this topic has been limited to-date. Therefore, a research on this subject is needed to investigate all of the factors affecting highway construction claims to …
-
Construction dispute mitigation through multi-agent based simulation and risk management modeling
<p>The construction industry is regarded not only as a backbone of the nation’s economy but also as an integral indicator of its efficiency and effectiveness. However, as a result of the risks and complexities that are naturally inherent with construction projects as well as the diverging interests …
-
Estimating productivity losses due to change orders
… the adverse impact of change orders on construction productivity. In order to provide an in-depth analysis of change orders and develop a reliable model, a comprehensive field study was carried out. The field study was conducted at a Montreal based firm, specialized in project management …
-
Review of construction management procedures of New Jersey Department of Transportation with the objective of minimizing claims
<p>Recent years have evidenced a growing spate of construction claims being filed against NJDOT. A mail survey was conducted and problem areas of NJDOT construction management procedures frequently contributing to claims have been identified. NJDOT's pre-construction scheduling system has been …
-
Understanding and preventing construction conflict, claims and disputes : a critical in-depth study into their causes and recommendations to control in the United Arab Emirates
Construction claims are considered by many project participants as one of the most disruptive and unpleasant events of a project (Ho & Liu, 2004). Researchers like Kumaraswamy (1996) argue that claims managers should focus not merely on the significant claims categories but also on the avoidable …
-
Construction Delay Analysis under Multiple Baseline Updates
… risks and increasing complexity of modern construction projects, delays and cost overruns have become common facts in the industry. Researchers and practitioners have used many techniques to assess project delays and apportion delay responsibility among the parties involved. Windows delay …
-
The Eichleay formula in Naval Facilities Engineering Command (NAVFACENGCOM) contracting.
… office overhead expenses currently exist in the construction litigation process today. The per diem Eichleay method is the most frequently utilized method. In this era of financial austerity, the armed forces are facing challenges to maintain operational readiness with fewer personnel and leaner …
-
The enforceability of time bar clauses in construction contracts : a comparative analysis between the Egyptian civil code and the English and Welsh common law jurisdictions
Construction claims are a fact of life on all projects across the world. In an attempt to safeguard themselves against the risk of claims, employers utilise time bar clauses in construction contracts to waive the contractor’s entitlement to any additional costs or time if a notice of claim is not …
-
Delay-caused claims in infrastructure projects under design-bid-build delivery systems
Delay-caused claims lead to cost overruns in infrastructure projects due to the cost of construction time and impacts on related services. The purpose of this study was to evaluate the causes and effects of these claims on road and bridge projects and to create an effective claims management …
-
4D Simulation of Capital Construction Projects: Levels of Development and Ontology for Delay Claims Applications
4D simulation is commonly used in building construction projects as part of Building Information Modeling (BIM) processes. A construction project progresses through different phases. At each of these phases, the project schedules and 3D models have various levels of development (LODs) ranging from …
-
Propuesta de implementación de la metodología Measured Mile para mejorar el sustento técnico en el reconocimiento de sobrecostos frente a la desestimación de los reclamos por pérdida de productividad en proyectos de construcción de Presas de Relaves en la zona centro del Perú, bajo un enfoque recomendado por el AACE
Por lo general, un Proyecto de Construcción de Mina presenta diversos tipos de afectaciones originados por una serie de eventos que generan cambios en el plan de trabajo, proceso de producción e incluso en la metodología constructiva. En consecuencia, se pueden generar impactos en la productividad …