Global ETD Search

Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.

Results

Showing 1 to 6 of 6 for “"Construction Cost Estimate"”.

  1. Data coordination

    … it depends. For example, a general contractor’s construction cost estimate (C) needs to be updated in response to changes made by an architect to a building design (B). Although these two databases are related in a very specific way, they contain information about fundamentally different types of …

    ubc Repository record for Data coordination (opens in a new tab) Download PDF for Data coordination (opens in a new tab)

  2. CONCEPTUAL COST MODELING OF INNOVATIVE INDUSTRIAL ESTATES USING SYSML AND CASE-BASED REASONING

    A conceptual cost estimate for a proposed facility is obtained with the briefest information. The simple method of estimating used in the industry results in an initial estimate that differs substantially from the final cost. The problem is more acute for innovative infrastructure projects because …

    nus Repository record for CONCEPTUAL COST MODELING OF INNOVATIVE INDUSTRIAL ESTATES USING SYSML AND CASE-BASED REASONING (opens in a new tab) Download file for CONCEPTUAL COST MODELING OF INNOVATIVE INDUSTRIAL ESTATES USING SYSML AND CASE-BASED REASONING (opens in a new tab)

  3. Integrating Building Information Modelling (BIM), Cost Estimating and Scheduling for Buildings Construction at the Conceptual Design Stage

    Estimating the construction time and cost of a building project is an essential task of construction manager, which benefits owners, engineers and contractors. Construction duration and cost, in particular, have profound influence on the outcome of a project at the conceptual stage of its life. The …

    ottawa-retro Repository record for Integrating Building Information Modelling (BIM), Cost Estimating and Scheduling for Buildings Construction at the Conceptual Design Stage (opens in a new tab)

  4. Sustainable road safety improvement through the promotion of an alternative mode : Okanagan Valley electric rail

    … safer, faster, less energy intensive and less costly modes of transportation. There are enormous social and economic costs associated with road collisions, which have been recognized world-wide as a serious problem. One local alternative to reduce auto use and resultant road collisions is the …

    ubc Repository record for Sustainable road safety improvement through the promotion of an alternative mode : Okanagan Valley electric rail (opens in a new tab) Download PDF for Sustainable road safety improvement through the promotion of an alternative mode : Okanagan Valley electric rail (opens in a new tab)

  5. Computer Integrated Model to Estimate the Construction Cost and Duration of Building Projects at Their Feasibility Stage

    … evaluating the feasibility of investing in the construction of new building projects based on cost and time constraints. They need to therefore have an idea about the project construction costs, the time required to finish construction of a project in its conceptual phase, and about the …

    ottawa-retro Repository record for Computer Integrated Model to Estimate the Construction Cost and Duration of Building Projects at Their Feasibility Stage (opens in a new tab)

  6. A Cost-estimating Building Information Modeling Tool Developed on Sketchup Platform for Single-Family Residential Design

    … (BIM) has become a popular tool in design and construction. Despite its wide applications, the cost-estimating function of BIM is not robust enough, especially for projects in the schematic design stage. One hurdle for BIM-based estimating is that the architects’ 3D models lack cost …

    washington Repository record for A Cost-estimating Building Information Modeling Tool Developed on Sketchup Platform for Single-Family Residential Design (opens in a new tab)