Results 1 to 20 of 25 for “"Construction Delay"”

  1. Construction Delay Analysis under Multiple Baseline Updates

    … risks and increasing complexity of modern construction projects, delays and cost overruns have become common facts in the industry. Researchers and practitioners have used many techniques to assess project delays and apportion delay responsibility among the parties involved. Windows delay …

    waterloo Repository record for Construction Delay Analysis under Multiple Baseline Updates (opens in a new tab)

  2. A computer integrated system for construction delay analysis : time and impact costs

    … ascertaining the nature of disruptions in construction contracting. In practice, attempts are made to identify the causes of delays, modify the schedule by incorporating revised durations, and determine the impacts associated with the new project time. The analysis itself is usually complex …

    concordia

  3. An investigation into the use of construction delay and disruption analysis methodologies

    Delay and disruption (DD) to contractors’ progress, often resulting in time and cost overruns, are a major source of claims and disputes in the construction industry. At the heart of the matter in dispute is often the question of the extent of each contracting party’s responsibility for the delayed …

    wlv Repository record for An investigation into the use of construction delay and disruption analysis methodologies (opens in a new tab)

  4. Minimizing and analyzing construction delay and its impacts: case studies and knowledge-based systems.

    … the fundamental principles associated with construction delay and recovering from the delay through actual acceleration. Methods for minimizing or eliminating construction delay and analyzing its impact on cost, quality, and timely completion of construction projects will be presented. A …

    nps Repository record for Minimizing and analyzing construction delay and its impacts: case studies and knowledge-based systems. (opens in a new tab)

  5. Apportioning liability in construction delay claims : an evaluation of contemporary practices in the U.A.E. and a proposal for improvements

    … exist for apportioning liabilities inconstruction delay claims. Yet, there is no much consensus among the practitionerstowards them. Often, the implementation of these theories, concepts and methodologies ina project is based on Decision Makers' (DMs) individual judgments. …

    salford

  6. Apportioning liability in construction delay claims : an evaluation of contemporary practices in the U.A.E. and a proposal for improvements

    … exist for apportioning liabilities inconstruction delay claims. Yet, there is no much consensus among the practitionerstowards them. Often, the implementation of these theories, concepts and methodologies ina project is based on Decision Makers' (DMs) individual judgments. …

    salford Repository record for Apportioning liability in construction delay claims : an evaluation of contemporary practices in the U.A.E. and a proposal for improvements (opens in a new tab)

  7. Dynamic decision making under uncertainty in renewable energy portfolio management and inventory management

    … for generating electricity, with or without construction delay. In addition, the abandonment strategies of considering shutting down one of the two power plants in the energy portfolio are studied. To develop these strategies, the expected per unit profit is maximized over a finite time …

    must-thes Repository record for Dynamic decision making under uncertainty in renewable energy portfolio management and inventory management (opens in a new tab)

  8. Embankment foundation reinforcement using rammed aggregate piers in Iowa soils

    … goal of the pier installation was to reduce the construction delay between embankment and abutment construction. At the adjacent Ramp "B" bridge abutment stone columns were installed in the foundation soils to increase slope stability at the interface between the silty alluvium and weathered …

    iastate Repository record for Embankment foundation reinforcement using rammed aggregate piers in Iowa soils (opens in a new tab)

  9. Dynamic Risk Analysis of Construction Delays Using Fuzzy-Failure Mode Effects Analysis

    … losses in the worldwide economy caused by construction delays, it is essential to invest in minimizing the risks of delays. In order to make this happen, two measures should be taken: 1) The roots and fundamental causes of delay should be identified and strategies to mitigate their risks be …

    unlv Repository record for Dynamic Risk Analysis of Construction Delays Using Fuzzy-Failure Mode Effects Analysis (opens in a new tab)

  10. DEVELOPMENT OF AN INTEGRATED DECISION ANALYSIS FRAMEWORK FOR SELECTING ICT-BASED LOGISTICS SYSTEMS IN THE CONSTRUCTION INDUSTRY

    The current application of logistics in the construction industry is relatively inefficient when compared with other industries such as retail and manufacturing. The factors attributed to this inefficiency include the fragmented and short-term nature of construction process and inadequate tracking …

    wlv Repository record for DEVELOPMENT OF AN INTEGRATED DECISION ANALYSIS FRAMEWORK FOR SELECTING ICT-BASED LOGISTICS SYSTEMS IN THE CONSTRUCTION INDUSTRY (opens in a new tab)

  11. The Impact of Design Documents on Time and Cost Overruns of Public Construction Projects in Ethiopia and Mitigation with BIM Implementation – a Case Study

    … in Ethiopia are experiencing considerable delaying until completion. Additional costs beyond the initially planned budget are required as well. This research studied factors that cause time and cost overruns in public building construction in Ethiopia. The study investigated Ethiopia's …

    ttu Repository record for The Impact of Design Documents on Time and Cost Overruns of Public Construction Projects in Ethiopia and Mitigation with BIM Implementation – a Case Study (opens in a new tab)

  12. Towards a risk management framework for Libyan house-building projects

    … are commonplace throughout the world in the construction industry. Libyan House-Building Projects (LHBP) experience the same dilemma and often to a greater extent. This is attributed to both unexpected and expected factors in which risk and uncertainty were not effectively dealt with. A focus …

    salford

  13. Towards a risk management framework for Libyan house-building projects

    … are commonplace throughout the world in the construction industry. Libyan House-Building Projects (LHBP) experience the same dilemma and often to a greater extent. This is attributed to both unexpected and expected factors in which risk and uncertainty were not effectively dealt with. A focus …

    salford Repository record for Towards a risk management framework for Libyan house-building projects (opens in a new tab)

  14. Using Building Information Modeling (BIM) and the Last Planner System (LPS) to Reduce Construction Process Delay

    The construction industry suffers from many practical problems and challenges; most being related to construction management. One of the most common recurring problems in construction projects is delay. Delay is a primary factor that can have an effect on project duration, scheduled delivery date, …

    wku-diss Repository record for Using Building Information Modeling (BIM) and the Last Planner System (LPS) to Reduce Construction Process Delay (opens in a new tab)

  15. Development of a risk response model to handle delays of construction projects in the United Arab Emirates.

    Due to the complex nature of construction projects, delay risks are more widespread in the construction sector than elsewhere. This poses a problem for the industry, since it is already at risk because of the recent global economic recession. Indeed, the financial crisis in late 2008 arrested …

    rgu Repository record for Development of a risk response model to handle delays of construction projects in the United Arab Emirates. (opens in a new tab)

  16. 4D Simulation of Capital Construction Projects: Levels of Development and Ontology for Delay Claims Applications

    4D simulation is commonly used in building construction projects as part of Building Information Modeling (BIM) processes. A construction project progresses through different phases. At each of these phases, the project schedules and 3D models have various levels of development (LODs) ranging from …

    concordia