  1. An evidence-based comparison of construction project delivery

    … potential risks to a patient. As with a patient, construction projects are all unique and take on their own characteristics throughout the life of the project. This research used the analysis-of-variance (ANOVA) method to analyze the risks associated with economics, environment, project, and …

    colostate Repository record for An evidence-based comparison of construction project delivery (opens in a new tab)

  2. Measurement of Resilience Performance for Infrastructure Construction Project Delivery

    … applies to processes, such as infrastructure project delivery processes. During these processes, a project often suffers inevitable threats and disruptions, which can significantly delay or derail the project if the process is not resilient. This research aimed to conceptualize resilience for …

    unm Repository record for Measurement of Resilience Performance for Infrastructure Construction Project Delivery (opens in a new tab)

  3. Trust-Building in the Construction Project Delivery Process: A Relational Lookahead Tool for Managing Trust

    … in technology and practices are pushing the construction industry to collaborate on a higher level. A key component of effective collaboration is trust. Research also suggests that increased trust levels can lead to improved productivity in team performance. Trust appears to be valued by …

    tamu Repository record for Trust-Building in the Construction Project Delivery Process: A Relational Lookahead Tool for Managing Trust (opens in a new tab)

  4. Analysis of the Texas A&M University System's Construction Project Delivery Method Performance: CMAR and CSP

    In recent decades, the use of construction manager-at-risk (CMAR) has surged as an innovative construction project delivery method in comparison to traditional competitive bid procurement methods. The conceptual pros and cons of the method are widely accepted throughout the construction industry; …

    tamu Repository record for Analysis of the Texas A&M University System's Construction Project Delivery Method Performance: CMAR and CSP (opens in a new tab)

  5. Exploring the Potential for the Application of Simulation Methods in Construction Project Delivery in New Zealand

    … of simulation-based techniques used within the construction management domain is mainly to facilitate the decision-making process. These technologically-based approaches enable construction operations managers and planners to gain a better understanding of the behaviour of the real-world process …

    auckland-tech Repository record for Exploring the Potential for the Application of Simulation Methods in Construction Project Delivery in New Zealand (opens in a new tab)

  6. ASSESSMENT OF PROJECT RISKS IN FAST-TRACK CONSTRUCTION PROJECTS

    … used to respond to demands for reduced construction project delivery times. Unique risks arising from the overlapping of activities can threaten the project. A framework is proposed to assess project risks in fast-track construction projects to better understand the intersection of …

    unm Repository record for ASSESSMENT OF PROJECT RISKS IN FAST-TRACK CONSTRUCTION PROJECTS (opens in a new tab)

  7. An empirical analysis of the effectiveness of design-build construction contracts: based upon projects executed by the Naval Facilities Engineering Command.

    Although the use of Design/Build as a construction project delivery method is quite common in private industry, it is a fairly recent phenomenon in the public sector. Further, while anecdotal reports of cost and time savings abound, little if any research has been published to date (as far as this …

    nps Repository record for An empirical analysis of the effectiveness of design-build construction contracts: based upon projects executed by the Naval Facilities Engineering Command. (opens in a new tab)

  8. A total lean construction framework

    Construction projects are often complex and require robust management strategies to address persistent challenges such as cost overruns, schedule delays, quality shortcomings, and sustainability issues. Despite the availability of various project management frameworks, there remains a critical need …

    strathclyde Repository record for A total lean construction framework (opens in a new tab)

  9. Planning for value-generating collaboration during the design/preconstruction phase

    … the body of knowledge concerned with improving construction project delivery, focusing specifically on better understanding the relationship between collaboration and value-generation, this thesis sought to explore the question of where, when, how, and why collaboration generates value to …

    msu Repository record for Planning for value-generating collaboration during the design/preconstruction phase (opens in a new tab)

  10. Development of a system model for cost management in low-cost housing projects in Nigeria

    Poor project cost performance is one of the vital issues challenging successful construction project delivery particularly in developing countries such as Nigeria. This issue is endemic particularly in Low-cost housing (LcH) projects with adverse effects on delivery, affordability of the target …

    salford Repository record for Development of a system model for cost management in low-cost housing projects in Nigeria (opens in a new tab)

  11. An investigation into the accident causal influence of construction project features

    The United Kingdom (UK) construction industry is one of the worst industries in the UK in terms of health and safety (H&S) performance. Numerous injuries, deaths, dangerous occurrences and work related illnesses are reported annually in the industry, and these are associated with huge economic and …

    wlv Repository record for An investigation into the accident causal influence of construction project features (opens in a new tab) Download file for An investigation into the accident causal influence of construction project features (opens in a new tab)

  12. Evaluating Project Assessment Techniques for High-Profile Transportation Projects Development and Delivery: Case of State Departments of Transportation (DOTs) in the United States

    Time delays and cost overruns in construction projects are generally due to factors such as inappropriate planning, design errors, unexpected site conditions, inadvisable tools selection, change scope, weather conditions, lack of resources, and other project changes. Time delays and cost overruns …

    portland-state Repository record for Evaluating Project Assessment Techniques for High-Profile Transportation Projects Development and Delivery: Case of State Departments of Transportation (DOTs) in the United States (opens in a new tab)

  13. Aligning Contractual, Technological, and Organizational Elements to Achieve Higher Performance buildings: A Qualitative Comparative Analysis Approach

    … phenomena in Architecture Engineering and Construction industry, addressing many criteria affecting the buildings’ design and construction such as sustainability, functionality and cost-effectiveness. Responding to all these criteria, however, requires a transitioning from the traditional …

    washington Repository record for Aligning Contractual, Technological, and Organizational Elements to Achieve Higher Performance buildings: A Qualitative Comparative Analysis Approach (opens in a new tab)

  14. The Impact of Design Documents on Time and Cost Overruns of Public Construction Projects in Ethiopia and Mitigation with BIM Implementation – a Case Study

    Timely completion of public building projects within the allocated budget and in the required quality is paramount for effectively using a facility to provide the intended public services properly. Typically, project owners plan to build public building projects following a critical demand from …

    ttu Repository record for The Impact of Design Documents on Time and Cost Overruns of Public Construction Projects in Ethiopia and Mitigation with BIM Implementation – a Case Study (opens in a new tab)

  15. Řízení stavebních projektů

    Předmětem diplomové práce "Řízení stavebních projektů" je popis procesu řízení a jeho praktikování na modelovém případu. První část se v teoretické rovině zaobírá obecně projektovým managementem, stavebně-projektovým managementem a jednotlivými metodami dodávky výstavbového projektu. V druhé části …

    brno-tech Repository record for Řízení stavebních projektů (opens in a new tab)

  16. Propuesta de mejora del proceso de planificación de proyectos en una empresa de construcción con sistema drywall

    La presente tesis es una “Propuesta de mejora del proceso de planificación de proyectos en una empresa de construcción con sistema drywall” desarrollada en una PYME del rubro construcción. La propuesta está basada en herramientas de ingeniería para contrarrestar el problema identificado en la …

    upc-peru Repository record for Propuesta de mejora del proceso de planificación de proyectos en una empresa de construcción con sistema drywall (opens in a new tab)

  17. Campus Planners' Preferences For Residence Hall Project Delivery Methods

    This research determined the preferred project delivery method utilized by campus planners when building student housing on a university campus. Four key performance indicators were also evaluated to determine if they influenced the campus planner to select a particular project delivery method. The …

    unf Repository record for Campus Planners' Preferences For Residence Hall Project Delivery Methods (opens in a new tab) Download PDF for Campus Planners' Preferences For Residence Hall Project Delivery Methods (opens in a new tab)

  18. The impact of contractual and legal factors on information management in AEC project delivery

    Information is a critical component of delivering projects in the architecture, engineering, and construction (AEC) industry. Digital technologies have emerged as an opportunity to improve information management and they have also presented new challenges. One of these emergent technologies is …

    texas Repository record for The impact of contractual and legal factors on information management in AEC project delivery (opens in a new tab)