Showing 1 to 20 of 36 for “"Construction Scheduling"”.

  1. Multi-Objective Multi-Project Construction Scheduling Optimization

    In construction industry, contractors usually manage and execute multiple projects simultaneously within their portfolio. This involves sharing of limited resources such as funds, equipment, manpower, and others among different projects, which increases the complexity of the scheduling process. The …

    concordia Download PDF for Multi-Objective Multi-Project Construction Scheduling Optimization (opens in a new tab)

  2. Construction Scheduling using Critical Path Analysis with Separate Time Segments

    Project managers today rely on scheduling tools based on the Critical Path Method (CPM) to determine the overall project duration and the activities’ float times. Such data provide important information about the degree of flexibility with respect to the project schedule as well as the critical and …

    waterloo Repository record for Construction Scheduling using Critical Path Analysis with Separate Time Segments (opens in a new tab)

  3. AI in Project Management: Machine Learning Application for Construction Scheduling

    … Intelligence (AI) and Machine Learning (ML) into construction project scheduling to address inefficiencies in traditional methods. While conventional tools like Primavera and MS Project rely heavily on manual input, existing AI/ML research often neglects critical scheduling components such as …

    salford Repository record for AI in Project Management: Machine Learning Application for Construction Scheduling (opens in a new tab)

  4. Investigating the Perceived Human Errors in 4D-BIM Construction Scheduling

    … building information modeling (4D-BIM or 4D Scheduling) is well known to benefit the construction industry in many ways. 4D-BIM is an effective scheduling technique which integrates traditional scheduling methods and advanced visualization of the construction sequences in a 3D environment. …

    clemson Repository record for Investigating the Perceived Human Errors in 4D-BIM Construction Scheduling (opens in a new tab)

  5. Adverse climatic conditions and impact on construction scheduling and cost

    … efficiencies and to demonstrate their impact on construction scheduling and cost. Additionally, it is intended to investigate alternatives available to the contractor. In order to demonstrate the impact of adverse climatic conditions on project schedule and cost, and actual construction contract …

    nps Repository record for Adverse climatic conditions and impact on construction scheduling and cost (opens in a new tab)

  6. Construction scheduling for urban freeway renewal projects: a case study

    … one of the most widely understood goals in the construction industry. How does one accomplish this completely subjective statement in a complex urban freeway renewal project like the I-235 Reconstruction? A fully integrated computer-based Program Master schedule should not only be developed, but …

    iastate Repository record for Construction scheduling for urban freeway renewal projects: a case study (opens in a new tab)

  7. Modified Niched Pareto Multi-objective Genetic Algorithm for Construction Scheduling Optimization

    … for multi-criteria decision making related to construction scheduling. In an attempt to overcome the drawbacks of similar efforts, the proposed multi-objective optimization model provides insight into construction scheduling problems. In order to generate optimal solutions in terms of the three …

    tamu Repository record for Modified Niched Pareto Multi-objective Genetic Algorithm for Construction Scheduling Optimization (opens in a new tab)

  8. Descriptive analysis of construction scheduling data towards automation of 4D building information modeling

    The integration of construction planning and scheduling into Building Information Modeling (BIM) workflows is still evolving. The common workflow to integrate the fourth dimensional (4D) of BIM still relies on the ability of manually linking construction activity tasks with 3D BIM-based objects. …

    uiuc Repository record for Descriptive analysis of construction scheduling data towards automation of 4D building information modeling (opens in a new tab)

  9. An object-oriented project model for integrating building design, construction scheduling, and cost estimating for mid-rise construction

    … a project model for integrating building design, construction scheduling, and cost estimating at the preliminary design stage was developed and analyzed. The project model is developed in an object-oriented environment. The project model accepts a set of preliminary design parameters and generates …

    uiuc Repository record for An object-oriented project model for integrating building design, construction scheduling, and cost estimating for mid-rise construction (opens in a new tab)

  10. Factors for generating initial construction schedules

    Schedule generation is a vital construction planning tool which is founded on experiential knowledge and on engineering and management procedures. In this dissertation a Knowledge-based Systems (KBS) approach is followed for acquiring, formalizing and representing construction scheduling knowledge.

    uiuc Repository record for Factors for generating initial construction schedules (opens in a new tab)

  11. Facility/infrastructure Resource Scheduling

    … devices, would allow near-optimal, dynamic crew scheduling. In addition to construction scheduling, the FIRS approach can directly assist disaster recovery and reconstruction planners and those in other time-sensitive dispatching domains.

    uiuc Repository record for Facility/infrastructure Resource Scheduling (opens in a new tab)

  12. As-built schedule comparison between urban and rural bridge construction projects

    … in duration between urban and rural bridge construction projects. It provides useful information for both contractors and organizations, such as Iowa DOT. This information allows the setting up of reasonable and reliable as-planned schedules for urban area bridge construction projects and …

    iastate Repository record for As-built schedule comparison between urban and rural bridge construction projects (opens in a new tab)

  13. Scheduling knowledge base for high-rise residential construction

    … and sequencing work for highrise residential construction projects. To facilitate the acquisition of practical construction scheduling knowledge, computerized project management capabilities were implemented into a medium size general building contractor, J.C. Scott Construction Ltd. of …

    ubc Repository record for Scheduling knowledge base for high-rise residential construction (opens in a new tab) Download PDF for Scheduling knowledge base for high-rise residential construction (opens in a new tab)

  14. An analysis of the use of Linear Scheduling Techniques in the construction industry.

    A construction scheduling technique is presented which is, in many cases, more advantageous, to both the contractor & the owner, than bar charts typically provided by contractors, particularly for projects that are linear in nature or have repetitive activities scheduled in phases (e.g. roads, …

    nps Repository record for An analysis of the use of Linear Scheduling Techniques in the construction industry. (opens in a new tab)

  15. An Interactive Visual Approach to Construction Project Scheduling

    … is an important pillar of success for a construction company. Project schedules are the primary tools for communicating the thinking and planning by the management team to all the stakeholders in a construction project. Traditional project scheduling software have become an indispensable …

    marquette Repository record for An Interactive Visual Approach to Construction Project Scheduling (opens in a new tab)

  16. Impact of nighttime resurfacing operations on asphalt roughness behavior

    The relationship between nighttime construction scheduling and future road quality in terms of roughness was investigated. Research was three-phased: interviews with local leaders in paving, on-site observations, and historical data analyses. Interviews and on-site observations served to explore …

    alabama Repository record for Impact of nighttime resurfacing operations on asphalt roughness behavior (opens in a new tab)

  17. Multiplan Models for Construction

    … can now use computers to do a number of construction computations which were formally done on hand calculators. The advent of user-oriented software packages has had a significant impact on the traditional data processing procedures of the construction industry. Among the software …

    ucf Repository record for Multiplan Models for Construction (opens in a new tab)

  18. Review of construction management procedures of New Jersey Department of Transportation with the objective of minimizing claims

    <p>Recent years have evidenced a growing spate of construction claims being filed against NJDOT. A mail survey was conducted and problem areas of NJDOT construction management procedures frequently contributing to claims have been identified. NJDOT's pre-construction scheduling system has been …

    njit Repository record for Review of construction management procedures of New Jersey Department of Transportation with the objective of minimizing claims (opens in a new tab)