Global ETD Search
Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.
Results
Showing 1 to 6 of 6 for “"Construction Work Zone"”.
-
Tool For Calculating User Delay Cost Associated With Urban Arterial Construction Zone
Roadway construction work zone imposes travel delay on the road users. The monetary cost of the delay is called user delay cost (UDC). Limited work has been done on quantifying UDC in Canada and their focus were rural highways. If there is a realistic estimate of UDC, it could lead to less schedule …
-
A Multi-Contextual Approach to Modeling the Impact of Critical Highway Work Zones in Large Urban Corridors
Accurate Construction Work Zone (CWZ) impact assessments of unprecedented travel inconvenience to the general public are required for all federally-funded highway infrastructure improvement projects. These assessments are critical, but they are also very difficult to perform. Most existing …
-
Evaluation of traffic control procedures for construction work zones containing pavement edge drop-offs
Pavement edge drop-offs commonly occur in construction work zones as the result of pavement overlays, pavement replacement, or shoulder replacement. The depth of the drop-offs can range from one inch when a flexible pavement overlay is applied up to two feet when a full-depth rigid pavement or …
-
Measuring Work Zone Throughput and User Delays
… of Ontario for rehabilitation, maintenance and construction projects. These rehabilitation and maintenance activities on highways involve lane closures, which reduce the traffic throughput and cause delays for the road users. The impact of these activities is very important and has led to …
-
Planning Of Detours For Major Construction Projects And Assessing Their Impacts On Traffic Operations
Maintenance and Rehabilitation (M&R) works are prevalent in the US highways to preserve an acceptable level of service. In the presence of construction works, detour planning around work zones is often compulsory to carry out the repair works properly and safely while also accommodating the needs …
-
Evaluation of Engineering Controls in Mitigation of Fecal and Chloride Contamination to An Urban Stream
… locations along Popenoe Run within the bounds of construction work zone and downstream of the restoration project. The seven sample sites were sampled collectively on randomly selected days prior, during and post stream rehabilitation. Statistical results delineated that total coliform …