Global ETD Search

Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.

Results 1 to 2 of 2 for “"Construction cost optimization"”

  1. Optimization of Storm Sewer Construction Costs Using a Microcomputer Program

    … storm sewer system there is a material and labor cost trade-off between changing pipe diameter for a specific flowrate while keeping physical pipe slope constant, and changing physical pipe slope for the same flowrate while keeping the pipe diameter constant. To calculate costs associated with …

    ucf Repository record for Optimization of Storm Sewer Construction Costs Using a Microcomputer Program (opens in a new tab)

  2. Implementación de la Metodología Last Planner System y el Análisis de Valor Ganado para la Optimización de Presupuesto y Plazo en Proyectos de Construcción de 5 Niveles y 1 Sótano: Caso de Estudio - Edificio Multifamiliar Bellavista, Arequipa

    … aborda los recurrentes retrasos y sobrecostos en proyectos de construcción multifamiliar en Arequipa - Perú, enfocándose en el caso de estudio del Edificio Bellavista en Arequipa. Mediante la implementación integrada del Last Planner System (LPS) y la metodología de Valor Ganado (EVM), …

    upc-peru Repository record for Implementación de la Metodología Last Planner System y el Análisis de Valor Ganado para la Optimización de Presupuesto y Plazo en Proyectos de Construcción de 5 Niveles y 1 Sótano: Caso de Estudio - Edificio Multifamiliar Bellavista, Arequipa (opens in a new tab)