Global ETD Search
Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.
Results 1 to 20 of 41 for “"Construction delays"”
-
Assessing the effectiveness of Libyan supervisors in dealing with construction delays
Delays are perhaps the most common and costly problem encountered in construction and civil engineering projects worldwide. According to the owner's requirements, in the Libyan construction industry, the owner's supervisor (OS) - either an individual supervisor engineer (SE) or a consultant …
-
Assessing the effectiveness of Libyan supervisors in dealing with construction delays
Delays are perhaps the most common and costly problem encountered in construction and civil engineering projects worldwide. According to the owner's requirements, in the Libyan construction industry, the owner's supervisor (OS) - either an individual supervisor engineer (SE) or a consultant …
-
Dynamic Risk Analysis of Construction Delays Using Fuzzy-Failure Mode Effects Analysis
… losses in the worldwide economy caused by construction delays, it is essential to invest in minimizing the risks of delays. In order to make this happen, two measures should be taken: 1) The roots and fundamental causes of delay should be identified and strategies to mitigate their risks be …
-
An investigation into the causes of construction delays in capital projects in Namibia
… initially set targets in terms of time. Project delays frustrate the process of development, have an immeasurable cost implication on the society and also lead to loss of reputation of the parties involved in the projects’ execution. There has been an increase in expenditure in recent years …
-
Causes of Construction Delays for High Rise Buildings: a Quantitative Comparison between the USA and India
… projects which make them prone to construction delays. Delays can lead to time overrun, affect the total project duration and the total cost, and could result in litigation. Most construction schedules are deterministic and do not include the uncertainty and risk inherent in the …
-
Factors leading to delays in construction in infrastructure based projects
… project teams to determine the factors affecting construction delays and their influence to the overall project duration. 'Multiple Regression' techniques were used to quantify the influence of independent variables that contribute to overall delays in construction. '
-
The role of management in the causes, effects and incidence of construction project delays
The construction industry is known as a very highly-fragmented industry with a large number of activities involving different parties and professionals such as project managers, architects, engineers, quantity surveyors, contractors, suppliers and financiers. As it is a fragmented industry, …
-
A BIM-based framework for site layout optimization and material logistics planning on congested construction sites
<p>Urban construction projects are characterized by the lack of available space on construction sites. Due to the confined nature of such sites, construction materials, equipment and manpower must be managed within the same area, leading to frequent conflicts. As a result, the construction site …
-
Influences on construction project delivery time
Construction delays are a global phenomenon. Factors causing construction delays in construction projects differ from country to country, due to different prevailing conditions. The prevailing conditions that could exert an influence on project delivery time are: political, economic, and physical …
-
Investigating the causes of missing field fixed issues from BIM-based construction coordination through semi-structured interviews
… and automatic clash detection have improved the construction coordination process in construction projects, the industry is still suffering from on-site fixes of issues, which can cause construction delays and cost overruns. In the literature, several research studies have investigated the causes …
-
Avaliação das oportunidades do gás natural liquefeito em pequena escala no Brasil sob as perspectivas do produtor, transportador e do onsumidor final
… oil and gas megaprojects sector indicate that construction delays and costs overrun are common, which questions the economy of scale assumption. In this context, small-scale liquefied natural gas (LNG) value chain emerge as an option that could enable the monetization of stranded onshore gas …
-
Deflection Minimization of Prestressed Concrete Girders
… slab thickness. Such adjustments lead to construction delays, increased costs, and if not properly dealt with, rider discomfort. Because of loss of prestress over time, increase in strength of concrete after release and variations in production factors, the accurate estimation of long-term …
-
Use of alternate water sources in construction operations
Due to population growth, construction and periodic drought, water has become a precious commodity, especially for areas in the state that receive very little rainfall. One way to reduce the demand for drinking water is to substitute non-drinking quality water in construction applications. Primary …
-
Construction Delay Analysis under Multiple Baseline Updates
… risks and increasing complexity of modern construction projects, delays and cost overruns have become common facts in the industry. Researchers and practitioners have used many techniques to assess project delays and apportion delay responsibility among the parties involved. Windows delay …
-
Causes of road projects’ delays: a case of Blantyre
The Construction Industry (CI) is recognised as a formidable sector that has the potential of facilitating the growth and development of a nation’s economy by providing the necessary infrastructure that is required to spur the growth of other industries. In many countries, such as Malawi, the city …
-
New construction and modernization within the community college system of California: Two satellite campus deans' perspectives regarding urban campus construction for the San Francisco city college system
… with a case study analysis of two major campus construction projects within the City College of San Francisco system (CCSF). Specifically, this study is intended to provide insight into the difficulties facing CCC administrators regarding unmet facilities needs within their campuses, and the …
-
Evaluating Single-Family Residential Construction Projects in Mexico and the United States of America: A Mixed Methods Comparative Study
All construction projects are constrained by three main factors: time, cost, and quality. However, they are rarely completed within the established timeline. Residential construction is one of the industry's most essential sectors, as housing is a fundamental human need that ensures basic …
-
Improving Predictions for Camber in Precast, Prestressed Concrete Bridge Girders
… prestressed concrete girders can lead to construction delays and can increase material and labor costs. However, the prediction and control of camber over time is difficult, because camber varies with many parameters, such as the concrete properties, curing methods, and temperature …
-
Controls and Concepts of Operation for Load Balancing with IPWRs in a High Renewables Penetration Grid
… in the United States is uncertain in the wake of construction delays and several plant closings, especially in deregulated wholesale electricity markets with cheap natural gas and increasing wind and solar penetration. As a firm low carbon resource, nuclear power plants can serve a key role in …
-
Evaluating the effect of delivery of government projects in the Northern Cape
The construction industry is a major player in the economy, generating both employment and wealth. However, many projects experience extensive delays and thereby exceed initial time and cost estimates. This study's aim was to determine the causes of delays in project delivery in the Northern Cape, …
Page 1 of 3