Global ETD Search

Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.

Results

Showing 1 to 20 of 1278 for “"Construction projects"”.

  1. Analysis of complex mechanisms of defect generation in construction projects generation in construction projects

    … provides a platform for thoroughly tracking construction defects to their root causes. Following this basis, the thesis develops a methodology that utilizes Fault Trees and risk Importance Measures (IMs) to identify the high frequency (i.e., most common) and the high magnitude (i.e., most …

    unsw Repository record for Analysis of complex mechanisms of defect generation in construction projects generation in construction projects (opens in a new tab)

  2. ARE CONSTRUCTION PROJECTS PROPERLY INSURED?

    To determine whether construction projects are properly insured, a risk management framework was developed. The process involved the identification of parties, relationships and individual risks; with an analysis of types of economic control that were necessary for all risks, and by ensuring …

    nus Repository record for ARE CONSTRUCTION PROJECTS PROPERLY INSURED? (opens in a new tab) Download file for ARE CONSTRUCTION PROJECTS PROPERLY INSURED? (opens in a new tab)

  3. QUALITY ASSURANCE IN CONSTRUCTION PROJECTS

    Quality assurance covers the whole construction process from design, construction to maintenance. Since the contractor is involved in the construction, quality assurance is taken in this study to refer to setting up of Quality Management Unit headed by Quality Assurance Manager or Quality Engineer …

    nus Repository record for QUALITY ASSURANCE IN CONSTRUCTION PROJECTS (opens in a new tab) Download file for QUALITY ASSURANCE IN CONSTRUCTION PROJECTS (opens in a new tab)

  4. Capability Traps in Construction Projects

    Despite having enough resources, most development projects fail to finish before schedule and within budget. We hypothesize that a possible reason for project failure could be a capability trap. Capability on a construction team refers to resources such as workforce, tools, etc. and their combined …

    tamu Repository record for Capability Traps in Construction Projects (opens in a new tab)

  5. Modern Slavery in Construction Projects

    … It is spread across several sectors, with construction being one of the most important. Modern slavery in construction projects has been scarcely studied despite its relevance and prevalence. This PhD research addresses this gap in knowledge by investigating modern slavery in construction …

    whiterose Download PDF for Modern Slavery in Construction Projects (opens in a new tab)

  6. Estimate at completion for construction projects

    Construction projects are complex and risky because there are so many variables that may affect their profitability especially in terms of their cost and schedule. The information provided by the measurement of progress, the expended dollars and the forecasting of the outcome of a construction …

    wvu Repository record for Estimate at completion for construction projects (opens in a new tab)

  7. Owner management of engineering/construction projects

    <p>The engineering and construction of process plants require that many people work together towards completion of one common project. Getting all these people successfully working together is both the primary function of management and the topic of this thesis.</p><p>This thesis avoids dealing …

    njit Repository record for Owner management of engineering/construction projects (opens in a new tab)

  8. Risk Assessment for Marine Construction Projects

    Marine-construction projects are becoming increasingly important for the development of the maritime industry. However, such increases are hampered by various risks that can significantly impact growth. Natural forces, political events, administrative and operational mistakes, equipment failures, …

    claremont Repository record for Risk Assessment for Marine Construction Projects (opens in a new tab)

  9. Risk management of repetitive construction projects

    Repetitive construction projects such as highways, high-rise buildings, and housing projects consist of repetitive construction activities that need to be repeated by the same crew in several locations in the project. Repetitive construction projects have inherent uncertainties that are commonly …

    uiuc Repository record for Risk management of repetitive construction projects (opens in a new tab)

  10. Optimized scheduling for repetitive construction projects

    … presented for optimized scheduling of repetitive construction projects such as: high-rise buildings, housing projects, highways, pipeline networks, bridges and tunnels. The model provides a number of practical features, and incorporates newly developed algorithms for scheduling of repetitive …

    concordia Download PDF for Optimized scheduling for repetitive construction projects (opens in a new tab)

  11. Fast-track approach to mining construction projects

    … at the engineering level; the design phase; the construction phase; and finally the production and processing phase. The important characteristic of this procedure lies in the sequential manner in which each phase is implemented during a project life cycle. In comparison, fast-tracking involves …

    ubc Repository record for Fast-track approach to mining construction projects (opens in a new tab) Download PDF for Fast-track approach to mining construction projects (opens in a new tab)

  12. Statistical Validation Implementation in Pavement Construction Projects

    … for assessing how well the materials and construction used by a Contractor on a project satisfy the SHA specifications. One of the key decisions is whether the SHA will conduct the acceptance sampling and testing or utilize Contractor data for acceptance sampling and testing. Title 23 Code …

    unr Repository record for Statistical Validation Implementation in Pavement Construction Projects (opens in a new tab)

  13. Optimal selection of Army military construction projects

    … Management (ACSIM) manages all Army military construction (MILCON) implementation and requests. Annually, the ACSIM submits a prioritized list of MILCON projects requiring Congressional approval. Typically, Congress does not approve all Army requests. This thesis develops an integer linear …

    nps Repository record for Optimal selection of Army military construction projects (opens in a new tab)

  14. Collaborative risk management in complex construction projects

    Construction project success depends on efficient and effective risk management (RM) and collaborative working. Standard RM frameworks are currently focused on single-firm organizations, whereas in practice, construction project RM involves multiple organizations. Therefore, the adaptation of RM …

    aalto Repository record for Collaborative risk management in complex construction projects (opens in a new tab)

  15. Proactive Risk Management in Healthcare Construction Projects

    Healthcare construction projects are characterised by high complexity, multiple stakeholders, strict operational requirements and the need to maintain ongoing healthcare services during construction activities. These conditions create significant challenges for effective risk management and …

    chalmers Repository record for Proactive Risk Management in Healthcare Construction Projects (opens in a new tab)

  16. Performance prediction model for Swedish construction projects

    Construction projects tend to be influenced by interrelated issues that can result in unexpected costs or time overrun. Therefore, a need is highlighted by the industry as well as in the literature, to develop predictive models, that can aid in decision-making and guidance for corrective action …

    chalmers Repository record for Performance prediction model for Swedish construction projects (opens in a new tab)

  17. Eco-decision Making for Pavement Construction Projects.

    … differentiating various parameters, to delineate projects conditions, and it is superior to other tools in terms of scope, system boundary, and data quality. (2) Improving the material production processes would be the most effective way to mitigate overall environmental impacts of pavement …

    washington Repository record for Eco-decision Making for Pavement Construction Projects. (opens in a new tab)

  18. Optimizing the planning of modular construction projects

    Modular construction provides many advantages including shorter project completion time, lower construction cost, improved productivity, and enhanced quality. The main goal of this research study is to develop novel models for optimizing the planning of modular construction projects. To accomplish …

    uiuc Repository record for Optimizing the planning of modular construction projects (opens in a new tab)

Page 1 of 64