Global ETD Search

Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.

Results 1 to 20 of 125 for “"Construction stages"”

  1. Temperature Effects on Integral Abutment Bridges During Early Construction Stages

    … on integral abutment bridges during early construction stages. Particular emphasis was placed on the evaluation of the resultant state of stress of the upper portion of the steel piling and portions of the girders immediately adjoining the integral abutment. A full-scale model representing …

    sdstate Repository record for Temperature Effects on Integral Abutment Bridges During Early Construction Stages (opens in a new tab)

  2. Temperature Effects on Integral Abutment Bridges During Final Construction Stages

    … integral abutment type bridge during the final stages of construction. This study is a continuation of the research carried out by Mumtaz B. Sarsam. Particular attention was given to the evaluation of the resultant state of stress in the end portion of the girder near and contained within the …

    sdstate Repository record for Temperature Effects on Integral Abutment Bridges During Final Construction Stages (opens in a new tab)

  3. Integration of Overlapped Design and Construction Stages Through Location-Based Planning Tools

    The overlap of design and construction stages is a current practice in the construction industry, which aims to shorten the project lead time and cost. Apart from the construction industry fragmentation and its difficulties imposed on project management, this type of project faces some additional …

    huddersfield Repository record for Integration of Overlapped Design and Construction Stages Through Location-Based Planning Tools (opens in a new tab)

  4. Settlement behaviour of concrete faced rockfill dams : a case study

    … the total stresses and displacements during construction and reservoir filling conditions. Hardening soil model is used in order to represent the non-linear, inelastic and stress dependent behaviour of rockfill material. Material model parameters are selected mainly referring to the previous …

    metu Repository record for Settlement behaviour of concrete faced rockfill dams : a case study (opens in a new tab)

  5. Investigation of initial construction stagesof incrementally launched post-tensioned concrete box bridges

    … incrementallaunching method is a fast, popular construction method for post-tensioned concrete bridgeswith mid-span size.It does not require scaffolding under the deck;therefore,it is especially preferred when a bridge passes over a deep valley, high traffic area,or an environmentally sensitive …

    metu Repository record for Investigation of initial construction stagesof incrementally launched post-tensioned concrete box bridges (opens in a new tab)

  6. A parametric study on three dimensional modeling of parallel tunnel interactions

    … program allows the user to define the actual construction stages of a NATM tunnel construction. In the analysis, construction stages are defined in such a way that firstly one of the tunnels is constructed and the construction of the second tunnel starts after the construction of the first …

    metu Repository record for A parametric study on three dimensional modeling of parallel tunnel interactions (opens in a new tab)

  7. Life cycle assessment of the geothermal power plant in the Patuha geothermal field, Indonesia

    … on the environment of the geothermal drilling, construction, and operation of the Patuha geothermal power plant. The LCA method for this research relies on the general framework outlined in ISO 14040:2006 and ISO 14044:2006 for environmental management. Following the impact analysis considered …

    reykjavik Repository record for Life cycle assessment of the geothermal power plant in the Patuha geothermal field, Indonesia (opens in a new tab)

  8. Cadeia de valor Leagile no desenvolvimento do projeto e construção de usinas eólicas offshore: proposta de framework de diretrizes

    … chain of offshore wind energy, especially the stages of project and construction determine, to a large extent, the price of electricity. Starting from the budget, you need to implement installation and planning techniques to increase your competitiveness. A strategy that can increase or perform …

    brazil-ufrn Repository record for Cadeia de valor Leagile no desenvolvimento do projeto e construção de usinas eólicas offshore: proposta de framework de diretrizes (opens in a new tab)

  9. eVOLVER - construção e automação de plataforma de cultura celular e utilização de métodos alternativos para a medição de pH

    The work is limited to going deeper into the construction stages of an eVOLVER, within the scope of its open source nature. ´Areas such as software, hardware and others components will be explored and explained in as much detail as possible, taking taking into account the author's areas of …

    brazil-ufscar Repository record for eVOLVER - construção e automação de plataforma de cultura celular e utilização de métodos alternativos para a medição de pH (opens in a new tab)

  10. Interactive design of braced excavations

    Construction of braced excavations in major urban areas has increased over the last few decades. It is a major concern of the designer to limit ground movement around an excavation in order to prevent damage to adjacent structures, utilities and roads. Existing design methods can accurately predict …

    vt Repository record for Interactive design of braced excavations (opens in a new tab)

  11. Computational modeling of prestress transfer, end-region cracks and shear behavior in prestressed concrete I-girders employing large-diameter strands

    … transfer with consideration of performance from construction stages, over the course of the service life, and up to the ultimate limit state can provide key insight into the suitability of using of 0.7-in. (17.8-mm) diameter strands. Further, it could serve as an economical tool for the …

    texas Repository record for Computational modeling of prestress transfer, end-region cracks and shear behavior in prestressed concrete I-girders employing large-diameter strands (opens in a new tab)

  12. Development of a graphical user interface for composite bridge finite element analysis

    … program named UTrAp was developed to analyze construction stages of curved/straight composite bridges. The original Graphical User Interface could not be used with the modified computation engine. It is the focus of this thesis work to develop a brand new Graphical User Interface with enhanced …

    metu Repository record for Development of a graphical user interface for composite bridge finite element analysis (opens in a new tab)

  13. CONSTRUCTABILITY ISSUES FOR CONNECTION BETWEEN SIMPLE SPAN PRECAST CONCRETE GIRDERS MADE CONTINUOUS

    … implementation optimizes all the phases of a construction project including planning, design, and construction stages. Success of constructability implementation can be easily measured by taking into consideration cost and schedule performance. Higher the degree of constructability …

    ohiolink Repository record for CONSTRUCTABILITY ISSUES FOR CONNECTION BETWEEN SIMPLE SPAN PRECAST CONCRETE GIRDERS MADE CONTINUOUS (opens in a new tab)

  14. An integrated facility management system (IFMS), supported by the virtual design and construction framework (VDC), for engineering laboratories

    Construction has always been characterized as a fragmented, complex, and challenging industry. This has been reflected throughout the life cycle of construction projects, whether in design, construction, or operation and maintenance (O&M). Although efforts have been made to identify and solve …

    lima Repository record for An integrated facility management system (IFMS), supported by the virtual design and construction framework (VDC), for engineering laboratories (opens in a new tab)

  15. A Helping Hand: Design process of a soft anthropomorphic end-effector for the construction industry.

    … designed for use with a collaborative robot on a construction site. As the construction industry changes to meet the demands of increasing populations and lack of skilled trades workers, new approaches are needed. This research explores the possibilities of a collaborative robot working on a …

    unsw Repository record for A Helping Hand: Design process of a soft anthropomorphic end-effector for the construction industry. (opens in a new tab)

  16. DATA-DRIVEN MODELING OF IN-SERVICE PERFORMANCE OF FLEXIBLE PAVEMENTS, USING LIFE-CYCLE INFORMATION

    … in the performance of pavements, the quality of construction and production are also as important as the other factors. The designed properties of Hot Mix Asphalt (HMA) pavements, known as flexible pavements, are subjected to change during production and construction stages. Therefore, most of …

    temple Repository record for DATA-DRIVEN MODELING OF IN-SERVICE PERFORMANCE OF FLEXIBLE PAVEMENTS, USING LIFE-CYCLE INFORMATION (opens in a new tab)

  17. A Scenic Design For Richard O'Brien's The Rocky Horror Show

    … into the research, development, and construction processes in order to create the realized production. I explain the challenges and obstacles I faced in the development and construction stages and how my communication with members of the design and production staff led to the final …

    ucf Repository record for A Scenic Design For Richard O'Brien's The Rocky Horror Show (opens in a new tab)

  18. Automatic Pull Request Description Generation Using Large Language Models

    … diff summarization as controlled evidence-construction stages. The study evaluates four generation modes on the AIDev and PRSummarizer datasets using an evidence-scoped large-language-model judge and a human ranking study. The raw mode is treated as the primary zero-shot baseline because it …

    ohiolink Repository record for Automatic Pull Request Description Generation Using Large Language Models (opens in a new tab)

  19. Infografia interativa na redação: o processo de produção no Diário do Nordeste à luz da teoria do jornalismo

    … on productive routine (gatekeeping) and the construction stages of the news. This research also draws on the theoretical framework on the subject, in concepts essential characteristics of computer graphics, as well as the methodological procedures and systematic empirical observations in …

    brazil-ufrn Repository record for Infografia interativa na redação: o processo de produção no Diário do Nordeste à luz da teoria do jornalismo (opens in a new tab)

  20. Multichannel digital voltmeter using the LM3S8962 evaluation board

    … obstacles were encountered in the design and construction stages. A description of the obstacles, and how they were overcome is described. The end design of both the shield circuit and software is then detailed end-to-end, along with an explanation of how to use the end product. Finally, the …

    texas Repository record for Multichannel digital voltmeter using the LM3S8962 evaluation board (opens in a new tab)

Page 1 of 7