Global ETD Search
Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.
Results
Showing 1 to 4 of 4 for “"Construction time management"”.
-
Real-time and Dynamic Planning and Scheduling Under Disruption Using Multi-hybrid Simulation and Optimisation
… and scheduling are the principal components of construction contract execution. Distinct studies have developed a wide range of tools and technologies for solving construction planning and scheduling problems. The distinguishing feature of construction planning and scheduling is its complex and …
-
Time & construction study on the Dimondale highway bridge
Thesis (B.S.)--Michigan State College of Agriculture and Applied Science, 1932
-
Bytový dům Suchdolské Zahrady - stavebně technologický projekt
Předmětem této práce je provádění stavby bytového domu v Praze městské části Suchdol. Tato zpráva zahrnuje technickou zprávu pro stavebně technologický projektu, technickou zprávu zařízení staveniště, technologický předpis, rozpočet, časové plánování, návrh strojní sestavy, kontrolní a zkušební …
-
Un modelo para mejorar el cumplimiento de las entregas a tiempo a través de MRP, TPM Y SLP en el sector construcción modular
Las entregas a destiempo son un problema recurrente en las empresas que representan un mercado incipiente pero también muy importante en la satisfacción de los clientes. Se presentan diversos factores que permite el retraso de los pedidos, como la planificación inadecuada de los materiales, los …