Global ETD Search
Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.
Results 1 to 20 of 245 for “"Construction work"”
-
Construction work Masculinity in the workplace
… has led to an increase in ‘feminised’ service work and an attendant and notable decline in ‘traditional’ masculine labour. This shift has meant that there are now fewer work spaces in which ‘traditional’ working-class masculinities are valued, constructed and expressed. It has also been argued …
-
Farm Repair and Construction Work in Minnesota
University of Minnesota Masters thesis. June 1921. Major: Agriculture. 1 computer file (PDF); 99 pages.
-
Biomechanical Feasibility of passive shoulder exoskeleton in construction work
In construction environments, there are many complex tasks that require arm and shoulder elevation and heavy load lifting on unstable platforms, such as the tasks of brick or cinderblock laying, which can lead to shoulder and back musculoskeletal disorders (MSDs) and injuries. In order to alleviate …
-
A Sensor Network System for Monitoring Short-Term Construction Work Zones
<p>Safety hazards encountered near construction work zones are high, both in number and in the kind. There is a need to monitor traffic in such construction zones in order to improve driver and vehicle safety.</p><p>In the past traffic monitoring systems were built with high cost equipment such as …
-
Using Simulation to Quantify the Impacts of Changes In Construction Work
Work changes are alterations to the original scope of a contract. Work changes are inevitable in a typical construction project due to the complex nature of the construction industry. It is not possible to foresee these changes at the pre-construction or bidding stages. The changes may affect …
-
Enhancing state energy production : construction work in progress in energy infrastructure projects
… the difference in cost recovery mechanisms for construction projects, which significantly affects the scale and timing of infrastructure investments. This paper examines a specific cost recovery mechanism, Construction Work in Progress (CWIP), and evaluates its role in supporting timely and …
-
A Connected Work Zone Hazard Detection System for Highway Construction Work Zones
Roadway construction workers have to work in close proximity to construction equipment as well as high-speed traffic, exposing them to an elevated risk of collisions. This research aims to develop an innovative holistic solution to reduce the risk of collisions at roadway work zones. To this end, a …
-
Identification and analysis of worker safety hazards in Midwest agribusiness construction work sites
<p>The construction industry is characterized by high fatality and injury rates. The dynamic nature of construction projects has exposed its workers to multiple safety hazards and risks, resulting to the high fatality and injury rates on sites. Agribusiness construction is a sub-classified area of …
-
Cue-based decision-making in construction work crews : an agent-based modeling approach
"Construction work crews often deal with ambiguities (e.g., mismatch between provided directives and existing situations) at the work face about 'what-to do'. In such a circumstance, the work crew is forced to interpret cues present at the work face surroundings to make a decision. This research …
-
An Evaluation of Driveway Assistance Devices for Construction Work Zones: A Microsimulation-Based Analysis
… driveway access points of one-lane, two-way work zone sections. The application of DADs can show better safety and operation performance compared to the traditional portable traffic control signals (PTCSs) since they provide additional directional information to the merging traffic at …
-
Using big data and machine learning for microscopic delay modelling at construction work zones
Work zones are lane closures essential to protect workers during highway maintenance and construction activities; however, they lead to congested traffic movement. To mitigate delay effectively, it is essential to understand factors that impact delay and develop the ability to predict delays …
-
Jerk as a Method of Identifying Physical Fatigue and Skill Level in Construction Work
Researchers have shown that physically demanding work, characterized by forceful exertions, repetition, and prolonged duration can result in fatigue. Physical fatigue has been identified as a risk factor for both acute and cumulative injuries. Thus, monitoring worker fatigue levels is highly …
-
Automated Construction Work Package Decision-Making Model Using RSMeans and LSTM Based Deep Learning
Construction projects involve complicated workflows with efficient resource management. One of the methods for successful project planning is Work Packaging (WP.) Composition of the WP has been done by human understanding, resulting in several critical problems, such as challenging WP of the …
-
Evaluation of traffic control procedures for construction work zones containing pavement edge drop-offs
Pavement edge drop-offs commonly occur in construction work zones as the result of pavement overlays, pavement replacement, or shoulder replacement. The depth of the drop-offs can range from one inch when a flexible pavement overlay is applied up to two feet when a full-depth rigid pavement or …
-
Regulatory and Financial Aspects of the Utility Industry Rate Treatment of Construction Work in Progress
Growth in utility construction programs has focused attention on the methods used by utilities to obtain the earnings needed to pay investors for the use of funds for construction expenditures.
-
Analyzing the relationship between site operational factors and construction work flow reliability : an SEM approach
Thesis (M.S.)--Michigan State University. Construction Management, 2010
-
MIDDLE RANGE THEORIZING ABOUT INFORMATION TECHNOLOGY IMPACT: A STUDY OF 3D CAD IMPACT ON CONSTRUCTION WORK PRACTICES
… of 3D CAD in the Architecture, Engineering, and Construction (AEC) industry. Middle range logic is used to formulate a theoretical accounting of both the objective features and subjective interpretations of 3D CAD. Middle range thinking also shapes the conceptualization of work practice by …
-
MetodologÍa para la evaluación y seguimiento de procedimientos constructivos de forma sostenible e integrada
… for evaluating and comparing different construction projects in an objective and systematic manner. It is innovative by incorporating issues as diverse as cost, occupational risks, environmental impact, and social impact. The methodology enables public administrations or other entities, …
Page 1 of 13