  1. Tool For Calculating User Delay Cost Associated With Urban Arterial Construction Zone

    Roadway construction work zone imposes travel delay on the road users. The monetary cost of the delay is called user delay cost (UDC). Limited work has been done on quantifying UDC in Canada and their focus were rural highways. If there is a realistic estimate of UDC, it could lead to less schedule …

    calgary Repository record for Tool For Calculating User Delay Cost Associated With Urban Arterial Construction Zone (opens in a new tab)

  2. Use of selected macroinvertebrates as indicators of sedimentation effects on Huntington River, Utah

    … to determine effects of sedimentation from construction of Electric Lake Dam, a state highway, and two bridges. Approximately 900 benthic samples were collected from riffle areas above, in, and below the construction zone from January, 1971 to December, 1973. Two settling basins below …

    byu Repository record for Use of selected macroinvertebrates as indicators of sedimentation effects on Huntington River, Utah (opens in a new tab) Download PDF for Use of selected macroinvertebrates as indicators of sedimentation effects on Huntington River, Utah (opens in a new tab)

  3. Optimal Detour Planning Around Blocked Construction Zones

    Construction zones are traffic way areas where construction, maintenance or utility work is identified by warning signs, signals and indicators, including those on transport devices that mark the beginning and end of construction zones. Construction zones are among the most dangerous work areas, …

    ucf Repository record for Optimal Detour Planning Around Blocked Construction Zones (opens in a new tab)

  4. Improvement of Conspicuity for Trailblazing Signs

    … using an instrumented vehicle through a construction zone-related detour, and a survey questionnaire. The findings indicated that use of a color combination other than traditional black on orange will improve driver performance and safety when used for trailblazing during critical …

    vt Repository record for Improvement of Conspicuity for Trailblazing Signs (opens in a new tab)

  5. Making sense of number : a study of children’s developing competence

    This study investigated young children's construction of meaning for number and explored ways to more comprehensively assess and portray the development of number sense in young children. Greeno's (1991) conceptualization of number sense as situated knowing in a conceptual domain was used to …

    ubc Repository record for Making sense of number : a study of children’s developing competence (opens in a new tab) Download PDF for Making sense of number : a study of children’s developing competence (opens in a new tab)

  6. A Study to Measure the Settlement Velocity and the Rate of Accumulation of Standard Dust

    Healthcare and construction professionals maintain that understanding the extent of infection control measures to be taken to protect immunosuppressed and other types of patients from airborne infection agents during construction is crucial knowledge. Aspergillus spores migrate alone and on dust …

    tamu Repository record for A Study to Measure the Settlement Velocity and the Rate of Accumulation of Standard Dust (opens in a new tab)

  7. On-Road Investigation of Fluorescent Sign Colors to Improve Conspicuity

    … using an instrumented vehicle through a construction zone-related detour. Questionnaire data were also obtained. The independent variables of interest were sign color combination, age, and visibility condition. The findings of Phase II indicated that use of a color combination other than …

    vt Repository record for On-Road Investigation of Fluorescent Sign Colors to Improve Conspicuity (opens in a new tab)

  8. Development of the Preliminary Guidelines for the Evaluation and Repair of Portable Concrete Barriers

    … accidents and prevent vehicles from entering the construction zone, while protecting drivers. The Texas Department of Transportation (TxDOT) requires a set of formal guidelines governing the evaluation and repair of PCBs. Arriving at the guidelines is a multi-task research procedure. Objectives of …

    tamu Repository record for Development of the Preliminary Guidelines for the Evaluation and Repair of Portable Concrete Barriers (opens in a new tab)

  9. Analysis and Reconstruction of Shipwreck YK 11 (c. Seventh Century A.D.) from the Theodosian Harbor at Yenikapı in Istanbul, Turkey

    … salvage archaeological excavations at the construction site of an underground railway station at Yenikapı in Istanbul, Turkey. These excavations have unearthed the remains of Constantinople’s Theodosian Harbor (Portus Theodosiacus), including 36 Byzantine shipwrecks. The detailed study of …

    tamu Repository record for Analysis and Reconstruction of Shipwreck YK 11 (c. Seventh Century A.D.) from the Theodosian Harbor at Yenikapı in Istanbul, Turkey (opens in a new tab)

  10. Evaluation of traffic control procedures for construction work zones containing pavement edge drop-offs

    Pavement edge drop-offs commonly occur in construction work zones as the result of pavement overlays, pavement replacement, or shoulder replacement. The depth of the drop-offs can range from one inch when a flexible pavement overlay is applied up to two feet when a full-depth rigid pavement or …

    iastate Repository record for Evaluation of traffic control procedures for construction work zones containing pavement edge drop-offs (opens in a new tab)

  11. The novel application of sensor technologies to monitor long-term vertical track displacement pre and post rehabilitation

    … pairs between every other tie in the settlement zone. Digital Image Correlation (DIC) and SAAs were used to measure the instantaneous and long-term displacement of the track, respectively, in order to assess the effectiveness of the piers. It was found that the instantaneous displacements of the …

    queens Repository record for The novel application of sensor technologies to monitor long-term vertical track displacement pre and post rehabilitation (opens in a new tab)

  12. Robust Methods for UHPC Early-Strength Determination and Quality Control for Accelerated Bridge Construction

    … concrete(UHPC) is an advanced cementitious construction material that has been widely used recently. The significant advantage of UHPC is that it can reach high compression strength of about 10-12 ksi after one day and about 21-23ksi after 28 days of casting. Such advantage is crucial for …

    unr Repository record for Robust Methods for UHPC Early-Strength Determination and Quality Control for Accelerated Bridge Construction (opens in a new tab)

  13. Looking in: Mapping representations of teachers' discursive writing practices

    … When students and teacher collaborated in the construction zone, a magical place where minds could meet, it became evident that learning was enhanced but for each of the participants learning was different.

    waikato-masters Repository record for Looking in: Mapping representations of teachers' discursive writing practices (opens in a new tab) Download file for Looking in: Mapping representations of teachers' discursive writing practices (opens in a new tab)

  14. Investigation Of Near-crash Traffic Events Based On Naturalistic Driving Data

    … • About 7.5% of the total events occurred on a construction zone or a blocked lane. • About 31% of the events occurred on a road segment with no traffic control and about 16% occurred on a freeway. • Signal traffic control was present in about 40% of the events. • About 47% of the events …

    hawaii Repository record for Investigation Of Near-crash Traffic Events Based On Naturalistic Driving Data (opens in a new tab)

  15. TECHNODAT,CAE SYSTÉMY - technologická etapa spodní stavby

    Náplní bakalářské práce je stavebně technologický projekt novostavby školícího střediska a sídla firmy Technodat, CAE systémy s.r.o. Projekt obsahuje technologické předpisy pro zemní práce, základové konstrukce, svislé a vodorovné nosné konstrukce spodní stavby. Technologické předpisy doplňuje …

    brno-tech Repository record for TECHNODAT,CAE SYSTÉMY - technologická etapa spodní stavby (opens in a new tab)

  16. Zabezpečení staveniště v souvislosti s pojištěním rizika odcizení

    Tato práce se zabývá zabezpečením staveniště proti krádeži pojištěním. Hlavním cílem práce je komparace pro tento účel vhodných pojistných produktů, které jsou nabízeny největšími pojišťovnami na tuzemském trhu. Nejprve bylo nutné identifikovat majetek, který je nejčastějším předmětem krádeží, dále …

    brno-tech Repository record for Zabezpečení staveniště v souvislosti s pojištěním rizika odcizení (opens in a new tab)

  17. Rekonstrukce víceúčelového zařízení - stavebně technologický projekt

    Tato diplomová práce zpracovává stavebně technologický projekt rekonstrukce Víceúčelového zařízení v obci Slavice. V práci je zpracována kompletní studie realizace včetně časového a finančního plánu. Práce také obsahuje technologický předpis pro hlavní objekt, kontrolní a zkušební plán kvality a …

    brno-tech Repository record for Rekonstrukce víceúčelového zařízení - stavebně technologický projekt (opens in a new tab)

  18. ZOO Brno, objekt občerstvení – hrubá stavba

    Cílem této bakalářské práce je stavebně-technologické řešení hrubé stavby objektu občerstvení v Zoologické zahradě Brno. Součástí této práce je technická zpráva zařízení staveniště, řešení dopravních tras, návrh strojní sestavy, časový plán, rozpočet, technologické předpisy, řešení problematiky …

    brno-tech Repository record for ZOO Brno, objekt občerstvení – hrubá stavba (opens in a new tab)

  19. Modernizace areálu Vienna Point 3, Brno – hrubá vrchní stavba

    Tato bakalářská práce si klade za cíl jasně popsat stavebně technologickou etapu hrubé vrchní stavby haly Vienna Point 3, v rámci modernizace celého areálu firmy. Obsahem je řešení zásobování montážních dílů a jejich doprava z výrobny až na určené místo stavby, zařízení staveniště, efektivní …

    brno-tech Repository record for Modernizace areálu Vienna Point 3, Brno – hrubá vrchní stavba (opens in a new tab)