Global ETD Search
Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.
Results
Showing 1 to 5 of 5 for “"Cost/Schedule Control Systems Criteria"”.
-
Procuring contracting officer's guide to Cost/Schedule Control Systems Criteria (C/SCSC)
… (PCO) role in implementing and administering Cost/Schedule Control Systems Criteria (C/SCSC) within the Department of Defense. The purpose of this study was to develop a practical guide to C/SCSC for the PCO to use as a ready reference while on the job or in a training environment. As such, …
-
The Impact of the Cost Schedule Control Systems Criteria on Electronics and Aerospace Contractors
… to abide by the general provisions of the Cost/Schedule Control Systems Criteria (C/SCSC).
-
The organizational impact of C/SCSC upon the Supervisor of Shipbuilding
Developing a management control system that will meet the needs of the government and its contractors has been a difficult task, particularly in shipbuilding. Only two Supervisors of Shipbuilding, SUPSHIPS Bath and Groton, have been involved with the implementation of the Cost/Schedule Control …
-
A feasibility analysis of implenting [i.e. implementing] C/SCSC concepts at U.S. Army depots
This thesis analyzes the feasibility of using Cost/Schedule Control Systems Criteria (C/SCSC) concepts at U.S. Army Depots. C/SCSC compliance is commonly used by the defense industry when contracting with the U.S. Government for large production and R&D (research & development ) programs. However, …